A maintenance plan has a completion requirement. The plan contains five maintenance items that produce five notifications.
Which system status must each notification have before the maintenance call is completed and the next maintenance call can be generated?
What does the structure indicator for a functional location determine? (Choose three)
Which account assignment category can you specify in a settlement profile?
Your customer wants the system to generate a serial number and an equipment master upon goods receipt of a material.
Which Customizing steps are required?
What does the cycle set sequence in a multiple-counter maintenance plan determine?
Which of the following steps are required to create a measuring point for performance-based preventive maintenance? (Choose two)
How do you define operations for preventive maintenance tasks?
Which scheduling parameter adjusts the cycle intervals of a maintenance strategy for each maintenance plan?
In a refurbishment order for external processing, where can you find information about the defective part after the goods issue has been posted?
Where do you define initial and subsequent buffers for the maintenance plan strategy?