Summer Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: exc65

According to the Indoor Environmental Quality credit category, which of the following is considered an unoccupied space?

A.

Mechanical and electrical rooms

B.

Restroom

C.

School classroom

D.

Corridor

Up lo how many maximum points can a project earn under the Regional Priority credit?

A.

One

B.

Two

C.

Three

D.

Four

Which statement is the U.S. Green Building Council vision?

A.

A transformed built environment leading to a sustainable future

B.

Buildings and communities will regenerate and sustain the health and vitality of all life within a generation

C.

Meeting the goals of the Paris Agreement and improving the lives of millions of citizens through better buildings

D.

To transform the building and construction sector across three strategic areas - climate action, health and wellbeing and resources and circularity

When considering water conservation and water efficient landscaping, which type of water would be most useful for landscape irrigation?

A.

Rainwater

B.

Blackwater

C.

Clean water

D.

potable water

The range of points required to maintain Gold level of LEED certification is

A.

40-49

B.

50-59

C.

50-69

D.

60-79

Which describes the difference between graywater and blackwater?

A.

Graywater includes storm water and potable water, whereas blackwater Includes stormwater and Irrigation

B.

Graywater may be used for irrigation or drinking, but blackwater should only be used as a source of process water

C.

Graywater includes wastewater from lavatory faucets, whereas blackwater includes waste water from toilets and urinals

D.

Graywater is approved for human consumption and may be supplied from wells or municipal water systems, whereas blackwater is comprised of wastewater from toilets and urinals

What organization reviews and provides final LEED certification report to projects?

A.

U.S. Green Building Council

B.

Green Building Initiative (GBI)

C.

Green Business Certification Inc.

D.

ASHRAE

What rating system should a project use if 55% of the project's gross floor area is appropriate to certify under LEED BD+C and 45% is appropriate under LEED O+M?

A.

LEED Building Design and Construction

B.

LEED Operations and Maintenance

C.

LEED Green Associate must decide which rating system is most applicable

D.

Project team must decide which rating system is most applicable

In the commercial LEED rating systems, which point range will achieve the Silver level of certification?

A.

30-39 points

B.

40-49 points

C.

50-59 points

D.

60-69 points

Which of the following third-party verification strategy contributes to environmentally preferable products?

A.

ASHRAE 90.1

B.

California's Title 24

C.

Green Buying Council

D.

Forest Stewardship Council