Which of the following is a minimum program requirement for LEED@ for New Construction and Major Renovations projects?

A.

Be a permanent building or space on existing land

B.

Commit to sharing data for water usage only

C.

Comply with maximum floor area requirements

D.

Comply with maximum ventilation rate requirements

Which of the following processes is conducted prior to building occupancy and removes indoor airbome contaminants by thoroughly exhausting old air and replacing it with fresh outdoor air?

A.

Bake-out

B.

Flush-out

C.

Air ejection

D.

Hot box analysis

Which of the following accurately describes Credit Interpretation Requests (CIRs)?

A.

CIRs allow project teams to obtain technical guidance for a particular credit in the LEED rating system

B.

Use of CIRs is limited to LEED projects

C.

Any approved CIR can be used for any LEED project

D.

U.S. Green Building Council (USGBC) company members and LEED registered project team members may approve CIRs

Which of the following Is the recommended tool for the project team to utilize In order to determine the target certification level?

A.

Scorecard

B.

Credit Submittal Form

C.

Project CIR

D.

It is not possible to estimate certification level without complete drawings

Which of the following strategies can be used for improving Indoor Environmental Quality during construction?

A.

Monitor outdoor airflow

B.

Calibrate sensors

C.

Maintain clean interior spaces

D.

Use integrated pest management

EPA's ENERGY STAR Portfolio Manager is used for measuring

A.

embodied energy

B.

only ongoing water performance

C.

only ongoing energy performance

D.

ongoing energy and water performance

Building and material reuse contribute to the sustainability goals of a project by

A.

reducing the use Of raw materials

B.

saving time during the material selection phase

C.

lowering the overall construction budget ot the project

D.

utilizing waste-to-energy as an alternative to fossil fuel extraction

By specifying the installation of occupancy sensors for the building's lighting system, what pair of LEED credit categories would be affected?

A.

Innovation and Water Efficiency

B.

Integrative Process and Sustainable Sites

C.

Location and Transportation and Materials and Resources

D.

Indoor Environmental Quality and Energy and Atmosphere

When a developer builds a new shopping center in a rural area, one externality might be

A.

an increase in profits for the developer

B.

an increase in traffic on adjacent roads

C.

an increase in installation of rooftop solar

D.

an increase in the fees for customer parking

Which of the following is an appropriate usage of U.S. Green Building Council (USGBC) terminology for a LEED project?

A.

LEED certified building

B.

LEED's certified building

C.

LEED Accredited Building

D.

LEED Registered, Gold Building