Summer Sale Special - Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: sntaclus

LEED Online can be used

A.

to register for the LEED AP exam

B.

by the public to look at projects used for case studies

C.

to purchase reference guides

D.

to monitor the entire project certification process

Which of the following may be awarded to a Green Building professional who " distinguishes professional leadership, contribution to the standards of practice and body of knowledge and continual improvement in the field " ?

A.

LEED Fellow

B.

LEED Green Associate

C.

LEED for Homes Green Rater

D.

LEED AP

Which of the following stakeholders are involved in the feedback mechanism?

A.

Occupants

B.

Civil Engineer

C.

Landscape Architect

D.

Building Energy Modeler

An owner of newly acquired land wants to design a building that uses materials that have minimal impact on the environment. Which of the following strategies would help achieve this goal?

A.

Life-cycle assessment

B.

Life-cycle costingC Simple payback

C.

Environmental assessment

Irrigation trends are tracked by using

A.

water sprinklers

B.

bubbler distribution systems

C.

submeters

D.

drip systems

What do team members enhance by collaboration during the integrative process?

A.

Project duration

B.

Life-cycle costs

C.

Construction costs

D.

Efficiency and effectiveness of systems

The range of points required to maintain Gold level of LEED certification is

A.

40-49

B.

50-59

C.

50-69

D.

60-79

Minimum acoustic performance is a prerequisite requirement that applies to

A.

LEED for Schools

B.

LEED for Hospitality

C.

LEED for Healthcare

D.

LEED for New Constructions and Major Renovations

In the commercial LEED Rating System, which point range will achieve the Certified level of certification?

A.

30-39 points

B.

40-49 points

C.

50-59 points

D.

60-69 points

Which of the following is a minimum program requirement for the LEED for New Construction and Major Renovations Rating System?

A.

Comply with minimum project size

B.

Include temporary structures in floor area calculations

C.

Define a site boundary for the sole purpose of complying with credits

D.

Comply with the best practices of the International Organization for Standardization (ISO)