Summer Sale Special - Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: sntaclus

A landscape architect, a civil engineer, and a city planner collaborate to reduce stormwater runoff at a new building. This collaboration is an example of what strategy?

A.

Integrative process

B.

Siloed design

C.

Rainwater management

D.

Life-cycle approach

Lighting controls are typically installed in buildings in order to:

A.

Prevent building managers from making changes to the light levels

B.

Improve occupant comfort and save energy throughout the building

C.

Filter glare produced by overhead fixtures and prevent ultraviolet radiation from reaching building occupants

D.

Provide a uniform light level across every space in a building

Which credit category attempts to reduce light pollution and discourages the development of previously undeveloped land?

A.

Regional Priority

B.

Sustainable Sites

C.

Energy and Atmosphere

D.

Location and Transportation

What does the U.S. Green Building Council (USGBC) administer?

A.

LEED Green Associate exams

B.

LEED rating systems development

C.

LEED Credentialing Programs related to Green Building practice

D.

LEED Project Certification through third-party certification bodies accredited by the American National Standards Institute (ANSI)

Unless mitigated, resource consumption over the life of a conventional building

A.

remains steady

B.

gradually decreases the total emissions footprint

C.

incrementally increases the total emissions footprint

D.

fluctuates between increasing and decreasing the total emissions footprint

Which of the following results from incorporating sustainable landscape design?

A.

Decreased maintenance costs

B.

Encouraged use of exotic plants

C.

Restored and regenerated habitat

D.

Increased use of pesticides and irrigation

Which of the following has the highest energy consumption in a typical U.S. office building?

A.

Lighting

B.

Cooling

C.

Space Heating

D.

Water Heating

An electrical utility company wants to reduce peak loads in their electrical grid. Which of the following strategies would best achieve this goal?

A.

Building electrification

B.

Purchasing power

C.

Net zero energy

D.

Demand response

Which of the following options is a source of Scope 1 greenhouse gas emissions?

A.

On-site landfills

B.

Business travel

C.

Purchased electricity

D.

Employee commuting

For benchmarking purposes, a baseline building performance is evaluated (by means of energy simul-ation model), as defined in

A.

ASHRAE 55-2010

B.

ASHRAE 52.2-2007

C.

ASHRAE 62 1-2010

D.

ASHRAE 90.1-2010. Appendix G