Spring Sale Special - Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: sntaclus

Which of the fallowing projects is eligible for LEED for Building Operations and Maintenance; Existing Buildings?

A.

A two-story LEED certified apartment building

B.

A park adjacent to a LEED certified building

C.

An existing single-family home that is LEED certified

D.

An existing LEED certified building located on a college campus

The interior of a hotel is under renovation. The project designer would like to incorporate adaptive reuse. Which of the following strategies would accomplish this goal?

A.

Relocate to a used building

B.

Reuse the current wood floors as wall panels

C.

Use reconditioned office equipment

D.

Convert the rooms into residential apartments

The result of proper design and operation of buildings and neighborhoods is an increase in energy

A.

supply

B.

demand

C.

efficiency

D.

consumption

Which type of site Is appropriate for development of LEED projects?

A.

Floodplain

B.

Greenfield

C.

Brownfield

D.

Undeveloped

Which of the following components comprise the Indoor Environmental Quality credit category?

A.

Energy, site, water reduction

B.

Light, sound, occupant experience

C.

Community connectivity, tobacco smoke control, green cleaning

D.

Recycled content, low Volatile Organic Compounds (VOCs) emissions materials, non point source pollution

Which of the following options is a source of Scope 1 greenhouse gas emissions?

A.

On-site landfills

B.

Business travel

C.

Purchased electricity

D.

Employee commuting

The US Green Building Council (USGBC) created which of the following?

A.

LEED Credential Maintenance Program (CMP)

B.

LEED Rating System

C.

LEED User

D.

LEED Operations and Maintenance exam

Which of the following represents a unit of carbon dioxide equivalent that is reduced, avoided, or sequestered to compensate for emissions occurring elsewhere?

A.

Green power

B.

Demand response

C.

Carbon offsets

D.

Renewable energy