The maximum number of points that can be achieved under the Energy and Atmosphere category for Building Design and Construction: New Construction and Major Renovation is:

A.

33

B.

35

C.

30

D.

31

Teams organize and work as part of an integrative process by working

A.

With team members in a linear pattern

B.

in smaller groups with nonrepetitive processes

C.

in small groups and as a Whole With iterative processes

D.

with team members having individual commitments and tasks

One of the requirements for the Sustainable Sites Credit. Rainwater Management is that projects must

A.

maximize open space within the LEED project Boundary

B.

calculate the total rainwater runoff for 75th percentile rainfall events

C.

use Green Infrastructure and Low Impact Development techniques within the LEED project boundary

D.

use a combination of both structural and non-structural measures to manage a 90th percentile rainfall event

in the triple bottom line which of the following capital resources represents the costs and benefits of a project for all the stakeholders?

A.

Economic

B.

Social

C.

Natural

D.

Community

The maximum number of credits that can be achieved under Energy and Atmosphere category for Building Design and Construction: New Construction and Major Renovation is

A.

30

B.

31

C.

33

D.

35

Strategies for improving building occupants ' comfort and control may consist of

A.

ensuring adequate ventilation, monitoring carbon dioxide and prohibiting smoking

B.

installing operable windows, giving occupants lighting control and providing ergonomic furniture

C.

designing for proper ventilation, monitoring outdoor airflow and including appropriate acoustic design

D.

specifying low-emitting materials, testing for radon and other on-site contaminants and installing entryway grates

The goal of regional priority credits is to incentivize project teams to

A.

use a LEED AP on the design team

B.

increase environmental education and advocacy

C.

achieve credits that address geographical specific environmental issues

D.

prioritize the needs of certain areas in the country that have more environmental impact needs than others

Which of the following accurately describes Credit Interpretation Requests (CIRs)?

A.

CIRs allow project teams to obtain technical guidance for a particular credit in the LEED rating system

B.

Use of CIRs is limited to LEED projects

C.

Any approved CIR can be used for any LEED project

D.

U.S. Green Building Council (USGBC) company members and LEED registered project team members may approve CIRs

Which statement is the U.S. Green Building Council vision?

A.

A transformed built environment leading to a sustainable future

B.

Buildings and communities will regenerate and sustain the health and vitality of all life within a generation

C.

Meeting the goals of the Paris Agreement and improving the lives of millions of citizens through better buildings

D.

To transform the building and construction sector across three strategic areas - climate action, health and wellbeing and resources and circularity

The Increase in air temperature in a developed area resulting from the dark surfaces of roadways, parking lots, and tarred rooftops is known as

A.

emissivity

B.

global warming

C.

greenhouse gas

D.

heat island effect