Which Is a component of a construction waste management plan?

A.

List of materials to be diverted from disposal

B.

Projected cost savings from diverting waste

C.

Quantity of waste generated from excavated soil

D.

Distance of the recycling facility from the project site

Which of the following energy end-use types offer the greatest opportunity for energy consumption reduction in new commercial office building?

A.

Ventilation

B.

Refrigeration

C.

Space heating

D.

Office equipment

Which of the following elements will reduce energy consumption in a commercial building?

A.

Low-performance insulation

B.

Building automation system

C.

Kitchen appliances

D.

Oversized mechanical equipment without controls

Which of the following must a waste reduction, reuse and recycling program collect and measure?

A.

Excavated soil and land-clearing debris

B.

Hazardous materials leaving the building

C.

Recycled content 0t purchased office supplies

D.

Waste diverted through recycling and reuse

In addition to prohibiting smoking inside buildings, it is also important to prohibit smoking near:

A.

Covered parking spaces

B.

Landscaped areas

C.

Air exhausts

D.

Building entrances

According to the Foundations of LEED, what determines how rating systems are applied to residential and institutional projects?

A.

LEED differentiates residential and institutional projects by applying different credit weightings for environmental impact categories

B.

LEED provides separate sustainable site criteria only for residential and institutional projects

C.

LEED assigns rating systems based on project type and scope, using market-sector-specific adaptations to ensure appropriate application for residential and institutional buildings

D.

LEED requires all residential and institutional projects to use LEED O+M

Which type of site Is appropriate for development of LEED projects?

A.

Floodplain

B.

Greenfield

C.

Brownfield

D.

Undeveloped

Which of the following Is a measure of energy use intensity?

A.

Daylighting and views

B.

Energy consumed per unit of floor space

C.

Systems with ENERGY STAR " requirements

D.

The amount of electricity a wind turbine can produce

What plumbing fixture eliminates water use?

A.

Dual-flush toilet

B.

Low-flow lavatory

C.

WaterSense-labeled toilet

D.

Composting toilet

Which of the following strategies should a project owner implement to understand water consumption?

A.

Use waterless urinals

B.

Use graywater for flush fixtures

C.

Install permanent water meters

D.

Install an onsite wastewater system