What is the primary purpose of using low-emitting partitions in office buildings?

A.

To reduce CO₂ levels

B.

To increase thermal comfort

C.

To increase spread of daylight

D.

To reduce volatile organic compounds (VOCs) levels

The Commissioning (Cx) Process has been structured to coincide with the phases of a generic project in which of the following sequences of phases?

A.

OPR, Design, Construction, Operations and Maintenance

B.

Basis of Design (BOD), OPR, Cx, Construction

C.

Pre-Design, Design, Construction, Occupancy and Operations

D.

Basic Design, Construction, Cx, Owner’s Project Requirements (OPR)

Lighting controls are typically installed in buildings in order to

A.

provide a uniform light level across every space in a building

B.

prevent building occupants from making changes to the light levels

C.

improve occupant comfort and save energy throughout the building

D.

filter glare produced by overhead fixtures and prevent ultraviolet radiation from reaching building occupants

LEED stands for

A.

Leadership in Eco and Energy Design

B.

Leadership in Efficiency and Energy Design

C.

Leadership in Energy and Environmental Design

D.

Leadership in Environmental and Efficiency Design

In order to maintain the LEED Green Associate credential, you must earn which of the following continuing education credits?

A.

15 hours per year with six hours being LEED specific

B.

15 hours every two years with three hours being LEED specific

C.

30 hours per year with three hours being LEED specific

D.

30 hours every two years with six hours being LEED specific

Which of the following is the reason Regional Priority credits are awarded?

A.

To help meet economic goals

B.

To encourage exemplary performance

C.

To address local environmental issues

D.

To promote innovation in building design

LEED certification steps generally proceed in which of the following order?

A.

Project Registration, Application Preparation, Submission, Application Review, Certification

B.

Application Preparation, Application Review, Project Registration, Submission, Certification

C.

Select LEED rating system, Submission, Application Review, Project Registration, Certification

D.

Application Preparation, Project Registration, Application Review, Submission, Certification

To reduce the use of potable water for irrigation, which of the following factors should be taken into consideration?

A.

Minimize pervious areas

B.

Minimize green roof area

C.

Maximize use of native species

D.

Maximize use of pervious pavement

Strategies for improving building occupants' comfort and control may consist of

A.

ensuring adequate ventilation, monitoring carbon dioxide and prohibiting smoking

B.

installing operable windows, giving occupants lighting control and providing ergonomic furniture

C.

designing for proper ventilation, monitoring outdoor airflow and including appropriate acoustic design

D.

specifying low-emitting materials, testing for radon and other on-site contaminants and installing entryway grates

Which of the following project types and scopes are addressed by LEED rating systems?

A.

LEED Operations & Maintenance: Schools

B.

LEED Interior Design and Construction: Data Centers

C.

LEED Building Design and Construction: Existing Buildings

D.

LEED Neighborhood Development: Warehouses and Distribution