A LEED forNeighborhood Development project is going to temporarily reroute existing transit service outside the required distances as pan or the construction process.The protect team has secured an agreement withthe transit agency to restore the rerouted service. What is the maximum number of years the service can be rerouted in order to quality tor Smart Location and Linkage Credit. Access to Quality Transit?

A.

One year

B.

Two years

C.

Three years

D.

Four years

A project calculates an overall annual heating and/or cooling consumption reduction using an energy efficiency model. Whichcredit would this calculation aid in documenting?

A.

Green Infrastructure and Buildings Credit. Heat Island Reduction

B.

Green Infrastructure and Buildings Credit. Solar Orientation

C.

Green Infrastructure and Buildings Credit. District Heating and Cooling

D.

Green Infrastructure and Buildings Credit. Infrastructure Energy Efficiency

What is meant by "connectivity’’as used in the LEED for Neighborhood Development Rating System?

A.

The on-site availability of public utilities.

B.

The opportunity of the Homeowners to meet and connect socially

C.

The number of publicly accessible street intersections pet square mile

D.

The availability of transit lines within walking distance of the geographic center of the project area

To meet the requirement of Smart Location and Linkage Credit. Access to Quality Transit, on a

600-ace 1243 hectares) site with 3,500 dwelling units, what Is the minimum number of units that must be within 1/4 mi. (400 m) walk distance of an existing streetcar stop?

A.

350 unite

B.

1,050 units

C.

1,400 units

D.

1,750 units

A project team has determined that achieving Green Infrastructure and Buildings Credit. Solar Orientation is feasible Based on a preliminary assessment of site features, sunlight and shading, themaximum solar access has been determined. What is the next step the project needs to take to incorporate optimum solar orientation into the site design?

A.

Determine whether each building can be designed within 15 degrees of geographical east-west

B.

Review local and federal tax incentives and incorporate the monetary value of incentives into the protect budget and site design

C.

Determine the total building square footage in the project and identify all buildings where one axis is at least 2.5 times longer than the others

D.

Study building envelopes and daylighting opportunities for planned development and adjust construction documents to reflect optimum solar orientation

Which of the following will be achieved If the project site is an infill site?

A.

Floodplain Avoidance

B.

Steep Stope Protection

C.

Mixed-Se Neighborhoods

D.

Agricultural Land Conservation

What can be omittedfrom the calculation verifying the percentage of reuse of buildings undergoing major renovation?

A.

Roof decking

B.

Structural floor

C.

Exterior skin and framing

D.

Nonstructural roofing material

On a project with 10 residential units, which of the following would contribute to achieving Neighborhood Pattern and Design Credit. Neighborhood Schools?

A.

Including a new middle school with a 12-acre (4.8 hectare) campus

B.

Including a new elementary school with a four-acre (1.6 hectare) campus

C.

Locating all of the units within a 1.5 mi (2414m) walking distance of an ousting high school

D.

Locating three units within a 1/2 mi. (800 m) walking distance, and seven units within a one ml. (1.600 m) walking distance of an existing elementary school

To ensure that future residents of a project are allowed to grow produce in side yards, balconies or rooftops. Neighborhood Pattern and Design Credit. Local Food Production requires a developer to

A.

retain an on-site garden management company.

B.

register the protect with American Farmland Trust.

C.

establish appropriate covenants, conditions, and restrictions.

D.

establish a community supported agriculture program.

A 10-acre ((our hectare) project has 5.000 ft (1 524 m) of sidewalks Trees and trellises are planned along several ofthose blocks to provide shading for the sidewalks In order to achieve Neighborhood Pattern and Design Credit Tree-Lined and Shaded Streetscapes. what is the minimum shaded sidewalk that would need to be provided?

A.

1,000 ft. (305 m)

B.

2,000 ft. (610 m)

C.

3,000 ft. (915 m)

D.

4,000 ft. (1 220 m)