Halloween Special - Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: sntaclus

What does OIR stand for in the context of Cisco ASR component replacement?

A.

Offline Installation and Reboot

B.

Operational Interface Redundancy

C.

Optical Interface Routing

D.

Online Insertion and Removal

Which hardware platform is Cisco UnifiedCommunications Manager typically deployed on?

A.

Cisco ASR routers

B.

Cisco Catalyst switches

C.

Cisco ISR routers

D.

Cisco UCS C-Series servers

What is the first action that must be taken before removing a standby supervisor module from a Cisco MDS 9700 Series Switch?

A.

Shut down the entire switch.

B.

Put themodule into out-of-service mode.

C.

Disconnect all network interface cables.

D.

Perform a manual failover to the standby supervisor.

What must be verified before installing or replacing DIMMs in a Cisco UCS server?

A.

Compatibility of the DIMM with the current firmware version of the server

B.

Current DIMM configuration and population order

C.

Exact type, speed, and capacity of the DIMM

D.

Maximum supported DIMM capacity for the server model

Which command prompt commands provide the most thorough network diagnostic information when troubleshooting connectivity issues between a Windows PC and a Cisco device?

A.

ipconfig /all

ping

B.

netstat -a

netsh wlan show interfaces

ipconfig /release

ipconfig /renew

C.

ping

tracert

netstat

D.

nslookup

arp -a

route print

What is the primary purpose of backing up the endpoint configuration prior to replacing the device?

A.

To troubleshoot network connectivity issues

B.

To update the firmware of the device

C.

To generate a performance report for the old device

D.

Torestore settings on the new device after replacement

Which two actions are typically performed in ROMMON mode during the password recoveryprocess? (Choose two.)

A.

Change the configuration register.

B.

Load the startup configuration.

C.

Save the configuration.

D.

Modify passwords.

E.

Reboot the device.

What is the purpose of the pre-service checklist in the endpoint replacement process?

A.

To ensure all necessary tools and personnel are available

B.

To test the functionality of the existing endpoint

C.

To verify the current configuration settings of the endpoint

D.

To gather information about the replacement unit

Which two network design strategies in Cisco data center solutions improve fault tolerance and high availability? (Choose two.)

A.

SAN extension over IP networks (FCIP)

B.

Redundant supervisor engines and fabric modules

C.

High-density 10/40/100 gigabit Ethernet connectivity

D.

Virtual port channels for link aggregation

E.

Access layer switch deployment