A business customer deploys workloads in the public cloud but now faces governance issues related to IT traffic flow and data security. Which action helps identify the issue for further resolution?

A.

Set up a secure tunnel from customer routers to protect traffic to cloud providers.

B.

Send IPFIX telemetry data from customer routers to a centralized collector to identify traffic to cloud providers.

C.

Build a zone-based firewall policy on Internet edge firewalls that collects statistics on traffic to cloud providers.

D.

Apply workload policies that dictate security requirements for cloud workloads.

Drag and drop the multicast protocols from the left onto the current design situation on the right.

Drag and drop the design use cases from the left onto the correct uRPF techniques used to prevent spoofing attacks Not all options are used.

You are designing a new Ethernet-based metro-area network for an enterprise customer to connect 50 sites within the same city. OSPF will be the routing protocol used. The customer is primarily concerned with IPv4 address conservation and convergence time. Which two combined actions do you recommend? (Choose two)

A.

Use a multipoint Metro-E service for router connections

B.

Use a single address per router for all P2P links

C.

Use P2P links between routers in a hub-and-spoke design

D.

Configure address aggregation at each site router

E.

Determine which OSPF routers will be DR/BDR

What are two examples of business goals to be considered when a network design is built? (Choose two.)

A.

standardize resiliency

B.

minimize operational costs

C.

integrate endpoint posture

D.

ensure faster obsolescence

E.

reduce complexity

Which two actions must merchants do to be compliant with the Payment Card Industry Data Security Standard (PCI DSS)? (Choose two.)

A.

Conduct risk analyses

B.

Install firewalls

C.

Use antivirus software

D.

Establish monitoring policies

E.

Establish risk management policies

Which development model is closely associated with traditional project management?

A.

Static model

B.

Agile model

C.

Evolutionary delivery model

D.

Lifecycle model

A customer migrates from a traditional Layer 2 data center network into a new SDN-based spine-and-leaf VXLAN EVPN data center within the same location. The networks are joined to enable host migration at Layer 2. What is the final migration step after hosts have physically migrated to have traffic flowing through the new network without changing any host configuration?

A.

Shut down legacy Layer 3 SVIs, clear ARP caches on all hosts being migrated, and then configure the legacy VRRP address onto new VXLAN core switches

B.

Increase VRRP priorities on new infrastructure over legacy VRRP values, then shut down legacy SVIs

C.

Shut down legacy infrastructure to allow VXLAN gateways to become active

D.

Shut down legacy Layer 3 SVIs and activate new preconfigured Layer 3 SVIs on VXLAN

A European national bank considers migrating its on-premises systems to a private cloud offering in a non-European location to significantly reduce IT costs. What is a primary factor prior to migration?

A.

data governance

B.

additional latency

C.

security

D.

cloud connectivity

SDWAN networks capitalize the usage of broadband Internet links over traditional MPLS links to offer more cost benefits to enterprise customers. However, due to the insecure nature of the public Internet, it is mandatory to use encryption of traffic between any two SDWAN edge devices installed behind NAT gateways. Which overlay method can provide optimal transport over unreliable underlay networks that are behind NAT gateways?

A.

TLS

B.

DTLS

C.

IPsec

D.

GRE