A company has experienced serious growth and the hosted applications are getting more and more hits. Based on the increased work load, applications have started to show signs of reduced performance, which is affecting the user experience.
Which two server metrics should be tracked to ensure that the customer experience remains within acceptable limits? (Choose two.)
A development team is using Cl/CD during application development During the latest releases runtime vulnerabilities have been indicated to address these vulnerabilities. a complete redesign oí the affected applications were required To overcome this issue black box testing has been proposed. What must be used to automate this testing within a Cl/CD pipeline.
Refer to the exhibit.
Which CI solution uses this file?
What is chaos engineering?
Refer to the exhibit.
A developer needs to scale the existing pods within the worked nodes. Which object should be edited to achieve this goal?
Refer to the exhibit.
A Python script implements a logger server. The log receives a message from Base that contains this text: TextMessage. How is the log formatted?
Refer to the exhibit.
An organization has issues with code-based failures after implementing a CI/CD pipeline to automate the builds and deployment phases of an application.
Which action must be added to the pipeline, after the application is deployed in the staging environment to minimize failures and to ensure a successful continuous deployment?
Refer to the exhibit A DevOps engineer must deploy two microservices The deployment must be installed in a new Kubernetes cluster. The microservices currently run in Docker and are managed by using the provided docker-compose yml file Drag and drop the steps from the left into order on the right to successfully deploy the microservices
A team must roll out updates on the production instance of an application. To avoid any service down time, the new version must be released alongside the old version. After the team ensures that the new version operates as it should, traffic will be redirected to the new version. Then the old version will be shut down.
Which deployment strategy must be used?
What is a benefit of monitoring the CI/CD pipeline?