Given is the following defect removal chart reported at the end of system testing - showing total defects detected and closed defects (fixed and successfully retested). A number of open defects are classified as critical. All tests have been executed.

Based on the chart above, what is the most appropriate next test phase? 1 credit

A.

Acceptance testing to verify the business process

B.

Acceptance testing to verify operational requirements

C.

Requirements testing as part of testing regulatory compliance

D.

Another system test cycle to verify defect resolution

Relying only on the information provided in the scenario, select the TWO items and/or features for which sufficient information is available to proceed with test design. 2 credits

A.

All supported credit cards

B.

Language localization

C.

Valid and invalid advances

D.

Usability

E.

Response time

Continuing with the Scenario described in the previous question, which of the following topics would you need to address in detail in the master test plan? 3 credits

A.

An approach to regression testing

B.

A list of boundary values for “advance amount”

C.

A description of dependencies between test cases

D.

A logical collection of test cases

Given the following figures for the testing on a project, and assuming the failure rate for initial tests remains constant and that all retests pass, what number of tests remain to be run? 3 credits

A.

700

B.

720

C.

784

D.

570

The business has asked for a weekly progress report. Which of the following would be appropriate as a measure of test coverage? 2 credits

A.

Percentage of business requirements exercised

B.

Percentage of planned hours worked this week

C.

Percentage of countries that have test scenarios

D.

Percentage of test iterations completed

In general which part of the testing activity is most difficult to estimate? 1 credit

A.

Test planning

B.

Test execution

C.

Test management

D.

Test design

Which aspect in the test estimate is the main risk in this project? 1 credit

A.

Quality of the specification

B.

Availability of end-users

C.

The costs of hardware and tools

D.

Unknown input quality due to third party development

In general, why is it NOT a good idea to estimate the testing effort based only on a percentage of development effort? Identify THREE valid reasons. 1 credit

A.

The quality of the development estimate may be poor.

B.

In general bottom-up estimation is always better than top-down estimation.

C.

The percentage based technique only applies to the V life cycle model.

D.

Using the same percentage every time does not address the level of risk of the application to be tested.

E.

The maturity of the organization, e.g. the quality of the test basis, quality of development testing, configuration management, availability of test tools, also influence the effort needed for testing.

F.

It builds on large set of historical data

G.

The result is almost always a too low estimate for the required test effort

Identify THREE items that would be part of the work-breakdown structure showing the key testing activities for the acceptance test project. 2 credits (for 2 out of 3 correct 1 credit)

A.

Test planning, test case preparation and test execution for each of the four iterations

B.

Work should be explicitly allocated to test completion, test management, installation and to training on using the system

C.

Activities to deploy the system in the user environment

D.

Regression testing in the second, third and fourth iterations

E.

Development activities for unit and integration testing

F.

Reviews on requirements documentation

G.

Defining test environment requirements for system testing

Testing effort can depend on a number of factors, which one of following is MOST likely to impact the amount of effort required?

A.

The predicted number of defects and the amount of rework required

B.

The ratio of developers to testers in the project team

C.

The planned use of a project management tool to schedule tasks

D.

The responsibilities for testers and developers being clearly defined