Tests are prioritized so that:

A.

You shorten the time required for testing

B.

You do the best testing in the time available

C.

You do more effective testing

D.

You find more faults

“How much testing is enough?”

A.

This question is impossible to answer

B.

This question is easy to answer

C.

The answer depends on the risk for your industry, contract and special requirements

D.

This answer depends on the maturity of your developers

Who is responsible for conducting test readiness review..?

A.

Project Manager

B.

Test Engineer

C.

Test Manager

D.

None of the above

What can a risk-based approach to testing provide?

A.

The types of test techniques to be employed.

B.

The total tests needed to provide 100 per cent coverage.

C.

An estimation of the total cost of testing.

D.

Only that test execution is effective at reducing risk.

Which of the following is most likely to cause failure in the implementation of a test tool?

A.

Underestimating the demand for a tool.

B.

The purchase price of the tool.

C.

No agreed requirements for the tool.

D.

The cost of resources to implement and maintain the tool.

In addition to risk, identify TWO other components of a testing strategy. 1 credit

A.

The entry and exit criteria for each test phase

B.

Test training needs for the project resources

C.

The test design techniques to be used

D.

Test performance indicators

E.

The test schedule

You have been asked to write a testing strategy for the company. Which statement best explains how risk can be addressed within the testing strategy? 1 credit

A.

A test strategy should address identified generic product risks and present a process for mitigating those risks in line with the testing policy.

B.

A test strategy identifies the specific product for a project risk and defines the approach for the test project.

C.

A test strategy is derived from the test policy and describes the way risk assessments are performed in projects.

D.

A test strategy is the result of a project risk analysis and defines the approach and resources for testing.

Part of the testing strategy indicates that you are going to be using systematic test design techniques. Your manager has asked that you present the main advantages of using these techniques at the next board meeting. Identify THREE main benefits of using systematic test design techniques within this company. 2 credits (for 2 out of 3 correct 1 credit)

A.

Easier to quickly adapt testing to changing requirements compared to experienced-based testing

B.

Targets certain types of faults

C.

Will guide experienced testers to find defects

D.

Provides a way to differentiate depth of testing based on product risks by using different techniques

E.

More enhanced documentation and therefore higher repeatability and reproducibility

F.

Will make non-systematic testing redundant

G.

Will reduce the need for early reviews

Which of the following is a benefit of independent testing? 1 credit

A.

Code cannot be released into production until independent testing is complete.

B.

Testing is isolated from development.

C.

Independent testers find different defects and are unbiased.

D.

Developers do not have to take as much responsibility for quality.

A number of options have been suggested for the level of independence to be employed for the testing on the next project, and are shown below.

i. External test specialists perform non-functional testing.

ii. Testing is outsourced.

iii. Testing is carried out by the developer.

iv. A separate test team carries out the testing.

v. Testing is performed by the business.

vi. Testing is performed by a different developer.

Which of the following orders the above in a correct order of independence? 1 credit

A.

i, ii, iv, vi

B.

ii, i, v, vi

C.

ii, v, i, iii

D.

i, iv, v, vi