Which statement correctly describes debugging? [K2]

A.

Testers identify defects, developers locate and correct defects, testers confirm the correction has cleared the original defect

B.

Developers identify defects, testers locate defects, developers correct and confirm the correction has cleared the original defect

C.

Testers identify and locate defects, developers correct defects and confirm the correction has cleared the original defect

D.

Developers identify, locate and correct defects, testers confirm the correction

has cleared the original defect

Which of the following would typically be identified using static analysis by tools? [K1]

A.

Spelling mistake on an error message

B.

A potential infinite loop

C.

Memory leakage

D.

A variable set to the wrong value

Which statement BEST describes when test planning should be performed? [K1]

A.

Test planning is performed only once, at the beginning of the life cycle, andgenerates a Master Test Plan

B.

Test planning is performed at the beginning of the life cycle and again at the beginning of test execution

C.

Test planning is performed at the beginning of the life cycle and again at every test level

D.

Test planning is performed continuously in all life cycle processes and activities

How does software testing contribute to the quality of delivered software? [K2]

A.

By detecting and removing all the defects in the delivered code and ensuring that all tests adhere to the quality standards set for the project

B.

By measuring reliability of the software and ensuring that it is always above 99.99%

C.

By identifying root causes of defects from past projects and using the lessons learned to improve processes and thus help to reduce the defect count

D.

By detecting all deviations from coding good practice and ensuring that these are corrected

When should testers be involved in reviewing a UAT specification? [K1]

A.

At the beginning of the project

B.

As soon as requirements have been approved

C.

As soon as the UAT specification has been drafted

D.

At any time before UAT begins

Regarding the process described above, what is the most important recommendation you would make using IEEE 1044 as a guide? 2 credits

A.

No priority or severity assigned

B.

Incident numbering is manual rather than automated

C.

No mentioning of reproduceability

D.

No classification on type of incident

Which of the following is least likely to be used as a technique to identify project and product risks? 1 credit

A.

Brainstorming

B.

Inspections

C.

Expert interviews

D.

Independent assessments

Risks should be constantly reviewed. Given the current situation, which one of the following factors is most likely to lead to a revised view of product risk? 3 credits

A.

The concerns over the user interface may lead to changes to the interface which cannot be implemented by development in time for the second test iteration.

B.

The concerns over the user interface raises the likelihood of a risk in that area and increases the amount of test effort needed for the user interface, thereby limiting the test effort available for other parts of the test management tool.

C.

The delivery of the application without the interface changes may upset the user community.

D.

The method used for test estimation is not accurate enough and hence the money spent on testing exceeded its budget.

Which test management control option is most appropriate to adopt under these circumstances? 2 credits

A.

Introduce mandatory evening and weekend working to retrieve the 3 week slippage.

B.

Reconsider the exit criteria and review the test plan in the context of the current situation.

C.

Advise the user community regarding the reduced scope of requirements and the additional incremental delivery.

D.

Arrange a meeting with the user community representatives to discuss the user interface.

Which of the following is a project risk mitigation step you might take as test manager? 1 credit

A.

Testing for performance problems

B.

Hiring a contractor after a test analyst leaves the company

C.

Arranging a back-up test environment in case the existing one fails during testing

D.

Performing a project retrospective meeting using the test results after each increment