What is the minimum gross floor area required for a Building Design and Construction (BD+C) project to be eligible for certification?

A.

250 ft2 (23 m2)

B.

500 ft2 (46 m2)

C.

750 ft2 (70 m2)

D.

1000 tt2 (93 m2)

Providing building occupants with real-time energy information is an example of conducting

A.

preventive maintenance

B.

using a leverage point to alter behavior

C.

targeting regional priority credit

D.

projecting greenhouse gas emission

Select the type of approach that promotes the conservation of Materials and Resources by linking elements in order to form relationships with their function

A.

Open Flow

B.

Closed Flow

C.

Open Systems

D.

Closed Systems

Which strategy for roof coverage best addresses both heat island effect and rainwater runoff from the roof only?

A.

100% vegetated

B.

100% high-albedo

C.

20% high-albedo and 80% conventional

D.

50% standing seam copper and 50% vegetated

Which credit category attempts to reduce light pollution and discourages the development of previously undeveloped land?

A.

Regional Priority

B.

Sustainable Sites

C.

Energy and Atmosphere

D.

Location and Transportation

Materials that would otherwise be discarded but are incorporated into a new building are considered to be

A.

reused materials

B.

local materials

C.

recycled materials

D.

renewable materials

The LEED reviewer advised a project team that an inappropriate rating system was chosen for a newly constructed school in operation for one year and undergoing minor improvements. What should the project team have done differently to avoid this error?

A.

Allow the LEED Project Administrator sole responsibility to review the appropriate rating system for the project

B.

Select LEED for Schools New Construction and Major Renovations Rating System, as this project is classified as a school

C.

Select LEED for Existing Buildings: Operations and Maintenance Rating System, as the Operational and Maintenance phase has begun

D.

Review the appropriate rating system and determine the best adaptation to use with consultation from U.S. Green Building Council

What is the maximum number of occupiable stories for a project to be considered LEED Building Design and Construction Homes and Multifamily Low-rise?

A.

Two

B.

Three

C.

Four

D.

Five

The LEED credit weightings. in regard to the most important environmental impacts and human benefits, are based on impact categories defined and established by the

A.

U.S. Green Building Council (USGBC)

B.

U.S. Federal Government and Department of Energy (DOE)

C.

Sheet Metal-and Air Conditioning Contractors National Association (SMACNA)

D.

American Society Of Heating, Refrigeration and Air-conditioning Engineers (ASHRAE)

Which of the following techniques IS recommended for preventing the negative effects of indoor pollutants?

A.

Deep cleaning all surfaces during occupant move-in

B.

Keeping material containers open during construction

C.

Specifying and installing low-emitting materials at the source

D.

Keeping doors and windows open after installation of interior finishes