Who is the most responsible for monitoring ongoing energy performance over the life of the building?

A.

LEED AP

B.

Contractor

C.

Facility Manager

D.

Commissioning (Cx) Agent

What is the percentage rule when making a decision on the rating system that is most appropriate to use for a project?

A.

30/70 rule

B.

40/60 rule

C.

50/50 rule

D.

60/40 rule

The LEED Pilot credit library plays an important role in the continuous evolution of LEED by

A.

developing new credits for U.S. projects only

B.

achieving the next threshold for exemplary performance

C.

limiting the number of times that a credit category appears in the rating system

D.

providing U.S. Green Building Council (USGBC) with feedback on achievability of proposed credits

In the context of LEED and universal design, which of the following features is directly related to social health?

A.

Foot-press door openers

B.

Non-slip safety mats

C.

Lactation pods

D.

High-efficiency chillers

Which of the following techniques IS recommended for preventing the negative effects of indoor pollutants?

A.

Deep cleaning all surfaces during occupant move-in

B.

Keeping material containers open during construction

C.

Specifying and installing low-emitting materials at the source

D.

Keeping doors and windows open after installation of interior finishes

What is considered a plug load?

A.

The electrical current drawn by regulated and non-regulated receptacles

B.

The electrical current drawn by an individual receptacle connected to a standby battery

C.

The electrical current that is non-regulated and has a major impact on the load of the overall network

D.

The electrical current drawn by all equipment that is connected to the electrical system through a wall outlet

Which of the following is a benefit of implementing green leases in Core and Shell projects?

A.

Enhanced energy performance

B.

Increased risk of non-compliance with LEED standards

C.

Reduced tenant turnover rates

D.

Increased tenant energy consumption

During which stage of a project is implementation of the Integrative Process most effective in improving performance?

A.

Operation

B.

Early de sign

C.

Construction

D.

Construction document

A newly constructed office complex in a drought-prone region aims to achieve LEED certification by minimizing its outdoor water use. The landscape architect considers implementing an efficient irrigation system and collecting rainwater to meet the site’s water needs. Which of the following actions would enhance irrigation efficiency while maintaining healthy plant growth in the office complex landscape?

A.

Adjusting irrigation schedules based on weather conditions

B.

Installing manually operated irrigation valves

C.

Selecting high-emissivity plant materials

D.

Increasing potable water use during dry periods

What organization reviews and provides final LEED certification report to projects?

A.

U.S. Green Building Council

B.

Green Building Initiative (GBI)

C.

Green Business Certification Inc.

D.

ASHRAE