A LEED AP Operations and Maintenance project is at the end of the second month of the performance period when the team notices that the water meter readings for one of the two submeters is not being recorded. What advice should the LEED AP give the project team in order to comply with Water Efficiency Credit, Water Metering?
A project owner has hired a Commissioning Authority (CxA) to develop a Commissioning (Cx) Plan which will be
submitted in the LEED application to document Energy and Atmosphere Credit, Existing Building Commissioning -
Analysis, Option 1. Existing Building Commissioning. At a minimum, what should be included in the Cx Plan?
Which product recycling requirement applies specifically to LEED AP® Operations and Maintenance Schools and Hospitality?
When conducting the Indoor Environmental Quality Credit, Occupant Comfort Survey what is the minimum percentage of building occupants that must respond?
Presuming all water fixtures meet the LEED Operations and Maintenance Rating System requirements, which of
the following statements is correct when considering baseline water usage in relation to water use?
Which of the following is an allowable method to increase cooling tower cycles of concentration?
When sampling a population in a multi-tenant building, how can the transportation surveys be distributed to meet Location and Transportation Credit, Alternative Transportation, Option 1. Transportation Survey?
An office building has an average annual occupancy of 75% and 30,000 ft2 (2 787 m2) of completely vacant space.
How many occupants should be entered into Portfolio Manager for the vacant office space?
When calculating Water Efficiency Credit, Outdoor Water Use Reduction, the irrigation of athletic fields
Which of the following people are required to be listed on the LEED project registration page?