The project team for a bank project located in a mall is wondering whether they can earn Location and Transportation Credit Surrounding Density and Diverse Uses, Option 2. Diverse Uses. When evaluating a map of nearby diverse uses, which of the following would you recommend to be entered in the calculation?

A.

Health club, Laundromat, Post office, Restaurant

B.

Hair salon, Movie Theater, Pharmacy, Restaurant

C.

Clothing store, Commercial office, Eye doctor, Supermarket

D.

Convenience store, Furniture store, Hardware store, Pharmacy

Which of the following would contribute to the Location and Transportation Credit, Surrounding Density and Diverse Uses, Option 2. Diverse Uses?

A.

An existing bus stop located 1/4 mi. (0.40 km) away from the LEED project's main entrance

B.

An existing restaurant that is 3/4 mi. (1.20 km) away from the LEED project's main entrance

C.

An existing fast-food restaurant with no drive-in service located 1/8 mi. (0.20 km) away from the LEED project's main entrance

D.

A planned school that will be occupied within 18 months of the date of the LEED project's initial certificate of occupancy and is located 1/4 mi. (0.40 km) away from the LEED project's main entrance

In a goal-setting workshop, a decision is made to place circulation at the exterior of the office perimeter next to the window wall. Which of the following is an example of integrated decision-making?

A.

Installing blinds to increase occupant comfort

B.

Darkening the color of the carpet along the perimeter to aid way-finding

C.

Lowering the heating set-point in the circulation space to conserve energy

D.

Issuing user guidelines which limit the height of occupant additions to cubicles along the perimeter

Which of the following can be considered pre-consumer recycled content?

A.

Aluminum cans used to make sheet metal

B.

Plastic bottles that are used to create upholstery fabric

C.

Sawdust from a lumber mill used to make composite board

D.

Glass manufacturing scraps (culls) that are used to create new glass

What should a team focus on first to significantly improve energy performance or achieve the lowest possible operation cost?

A.

Choosing energy efficient systems

B.

Conducting a simple box energy model

C.

Implementing passive design strategies

D.

Performing commissioning of energy systems

If the client has purchased green power that is not Green-e certified, then the project team should

A.

accept not earning Energy and Atmosphere Credit, Green Power

B.

provide documentation as to how the green power is equivalent to Green-e certified

C.

apply for an Innovation Credit and explain the situation in a narrative

D.

apply the percentage to Energy and Atmosphere Credit, Renewable Energy Generation

The contractor has submitted waste hauling reports for review in order to achieve Materials and Resources Credit, Construction and Demolition Waste Management. Which of the following by-products on the documentation contribute toward the credit?

A.

Excavated soil

B.

Wood derived fuel

C.

Items sent to the local incinerator

D.

Fine waste used as Alternate Daily Cover

Which of the following appliances are included in Water Efficiency Prerequisite, Indoor Water Use Reduction?

A.

Commercial dishwashers and coffee makers

B.

Residential clothes washers and dishwashers

C.

Residential dishwashers and drinking fountains

D.

Commercial clothes washers and coffee makers

A mechanical engineer needs to identify spaces that are considered densely occupied according to LEED in order to document

A.

Indoor Environmental Quality Credit, Interior Lighting, Option 2

B.

Indoor Environmental Quality Credit, Thermal Comfort, Control Requirements

C.

Indoor Environmental Quality Credit, Indoor Air Quality Assessment, Option 2. Air Testing

D.

Indoor Environmental Quality Credit, Enhanced Indoor Air Quality Strategies, Option 2 C. Carbon Dioxide Monitoring

A project has performed an energy model which has resulted in the following energy end use consumption:

To meet the requirements for Energy and Atmosphere Credit, Advanced Energy Metering, Option 2. Advanced Metering, energy meters must be installed for energy end uses in

A.

space cooling, interior fans and receptacles

B.

interior lighting, space heating, space cooling and interior fans

C.

interior lighting, space heating, space cooling, interior fans and receptacles

D.

exterior lighting, interior lighting, space heating, space cooling, interior fans, service water heating and receptacles