Which of the following projects are eligible for LEED certification?

A.

Prefabricated sandwich panel house

B.

New office building 900 ft² (83.6 m²)

C.

Houseboat

D.

Mobile home

Which rating system is being used if all of the credits below have been submitted towards certification?

- Location and Transportation Credit, Reduced Parking Footprint

- Energy and Atmosphere Credit, Fundamental Refrigerant Management

- Indoor Environmental Quality Credit, Acoustic Performance

- Materials and Resources Credit, Persistent, Bio accumulative, and Toxic (PBT) Source Reduction - Lead, Cadmium, and Copper

A.

Building Design and Construction: Schools

B.

Building Design and Construction: Healthcare

C.

Building Design and Construction: Hospitality

D.

Building Design and Construction: Data Centers

The design team for a school project finds that they can achieve an 18% savings in indoor water use from the baseline. If the team adds a rainwater harvesting system that reduces water use by another 10%, they can earn:

A.

Zero points because they have not fulfilled the Water Efficiency Prerequisite, Indoor Water Use Reduction

B.

Only the Water Efficiency Prerequisite, Indoor Water Use Reduction

C.

Two points for Water Efficiency Credit, Indoor Water Use Reduction

D.

One or two points for Water Efficiency Credit, Indoor Water Use Reduction depending on the type of metering installed

What LEED Building Design and Construction rating system mandates a preliminary LEED meeting with the principal members of the project team to create a LEED action plan that includes the anticipated certification tier, targeted credits and parties responsible for each credit?

A.

Healthcare

B.

Schools

C.

Data centers

D.

Hospitality

Which of the following contributes to the value of the commissioning process?

A.

Ensuring that the project budgetary goal is met

B.

Verifying that the building systems perform as intended

C.

Verifying that the building water fixtures are installed properly

D.

Ensuring that the project is delivered to meet the permitting requirements

Under Energy and Atmosphere Credit: Optimize Energy Performance, Option 1: Whole-Building Energy Simulation, how can the energy cost savings be accurately determined?

What requirement must be met when creating a Demand Response Program that satisfies Energy and Atmosphere Credit, Demand Response?

A.

Permanently reduce the energy consumption in the building by 5%

B.

Demonstrate submetering of the two highest electrical end uses

C.

Demonstrate a load shift reduction of 5% in the building

D.

Create a comprehensive plan for meeting a demand response event

Which of the following credit options can a project team attempt if a local, national, or international organization indicates that the neighborhood site of the project has a significant cultural value?

A.

Historic district

B.

Priority designation

C.

Brownfield remediation

D.

Diverse uses

Which of the following assessments is conducted prior to the completion of the schematic design and explores methods to reduce energy use within a proposed building?

A.

Energy audit

B.

Building systems commissioning (Cx)

C.

Simple box energy analysis

D.

Mechanical systems inspection

The Water Efficiency Prerequisite, Outdoor Water Use Reduction requires a reduction over a baseline that is calculated for the site:

A.

Over the entire year

B.

For the watering month

C.

For the average watering month

D.

Over the driest three-month portion of the year