What is the minimum percentage of gross floor area that must be complete for a project to use LEED BD+C: New Construction and Major Renovations?

A.

40%

B.

100%

C.

60%

An urban office building project is installing a cooling tower. To save on potable water, the project would like to use a nonpotable water source to provide 20% of the cooling tower makeup water to achieve the maximum number of points under Water Efficiency Credit, Cooling Tower Water Use. Which nonpotable water source would be the most appropriate for use?

A.

Municipally supplied tap water

B.

Ground surface stormwater runoff

C.

Rainwater collected from the building roof

D.

Graywater from the building ' s hand-washing sinks

What type of lighting can be used for 25% or less of the total connected lighting load for all regularly occupied spaces as a strategy to improve lighting quality?

A.

Low-mercury lighting

B.

Direct-only overhead lighting

C.

Light sources with a CRI of 80 or higher

D.

Low fixture glare

A design team is evaluating strategies to ensure that a healthcare facility remains operational for critical services during frequent power outages. The building currently relies on a diesel generator for emergency power, but the owner is interested in sustainable alternatives that can also contribute to the project’s energy efficiency during normal operations.

Which of the following strategies should the design team recommend to provide energy resilience for the healthcare facility while enhancing energy efficiency during regular operations?

A.

Install a new natural-gas generator as the primary source of backup power

B.

Implement solar photovoltaic panels with a battery energy-storage system

C.

Increase the capacity of the existing diesel generator

What is a benefit of including the public in a charrette for a new school before the pre-design phase?

A.

Neighbors can plan for future construction

B.

It will help streamline the permitting process

C.

Potential partnerships with the community can be revealed

D.

The owner can determine financial strategies based on the public ' s input

Radiant-floor heating is proposed in a sensory zone to improve thermal variability in a new school. Which option in EQc3: Occupant Experience Performance will this design decision contribute to?

A.

Adaptable environment

B.

Solar glare

C.

Outdoor connections

D.

Resilient spaces

A commercial new construction project consists of mixed space usage. When deciding which LEED rating system to use, the LEED AP should follow which of the following rules?

A.

If a rating system is appropriate for less than 50% of the gross area of the LEED project space then the rating system must not be used

B.

If a rating system is appropriate for more than 50% of the gross floor area of LEED project space, then that rating system must be used

C.

If a rating system is appropriate for 30% to 60% of the gross floor area, the project team must independently assess their situation and decide which rating system is most applicable

D.

If a rating system is appropriate for 40% to 60% of the gross floor area, the project team must independently assess their situation and decide which rating system is most applicable

What is the minimum gross floor area required for a Building Design and Construction project to be eligible for

certification?

A.

250 ft2 (23 m2)

B.

500 ft2 (46 m2)

C.

750 ft2 (70 m2)

D.

1000 ft2 (93 m2)

A building in a rural area with an FAR of 1.7 is planning to pursue a point under SSc2: Accessible Outdoor Space. Which of the following criteria will help the project achieve the credit?

A.

Driveways designed with paver blocks

B.

A space dedicated to community gardens

C.

Covered car park

D.

A permanent and secure bicycle repair station

What building classification requires the energy model to determine the predicted power usage effectiveness (PUE) for Energy and Atmosphere Prerequisite, Minimum Energy Performance?

A.

Office

B.

Hospital

C.

Warehouse

D.

Data Center