During the early stages of a LEED for Schools project, the team was able to reduce the number of lighting fixtures in classrooms by 25% because the project team selected paint color whose light reflectance value was 75% instead of the initially proposed 64% value. This strategy is an example of applying which of the following credits to the project?

A.

Innovation Credit, Innovation

B.

Integrative Process Credit

C.

Indoor Environmental Quality Credit, Interior Lighting, Option 1. Lighting Control

D.

Materials and Resources Credit, Interiors Life-Cycle Impact Reduction

Who must be a member of the integrated project team for the Integrative Process Prerequisite, Integrative Project Planning and Design?

A.

The general contractor

B.

A LEED AP

C.

The project ' s mechanical engineer

D.

The owner or an owner ' s representative

Which of the following scenarios contributes to earning credit under MRc1: Materials and Resources, Option 2. Materials Reuse?

A.

Donate salvaged wood to a local nonprofit organisation that repurposes materials

B.

Reuse salvaged metal beams in the construction of the new project

C.

Sell recovered bricks to a salvage retailer for off-site reuse

In what way can synergies between LEED credits enhance sustainability outcomes on a project?

A.

Use low-emitting materials to optimise energy performance, contributing to Materials and Resources and Energy and Atmosphere credits

B.

Install a green roof to reduce the heat-island effect and improve energy efficiency, contributing to Sustainable Sites and Energy and Atmosphere credits

C.

Choose materials with high recycled content to improve thermal comfort, contributing to Materials and Resources and Indoor Environmental Quality credits

When should a preliminary water budget analysis be conducted?

A.

At the time the design development is completed

B.

At the time the plumbing contractor is selected

C.

After completion of schematic design

D.

Before completion of schematic design

A new Science Education Center is pursuing LEED certification. Which of the following strategies could be submitted to earn an Innovation in Design credit?

A.

The selection of energy-efficient LED fixtures for all of the building ' s lighting

B.

The installation of an air-purifying facade material on the front entrance of the building

C.

The integration of rainwater management strategies to achieve a Regional Priority Credit

D.

The implementation of a comprehensive metering strategy to measure three individual energy end uses

How can a facility manager promote both energy efficiency and thermal comfort in a building?

A.

Survey occupants about their comfort on a regular basis

B.

Avoid overcooling during warmer seasons

C.

Provide a constant temperature setpoint for the year

D.

Ask the cleaning contractor to turn off all of the lights after cleaning

Which of the following projects is eligible to pursue the Energy and Atmosphere Prerequisite, Minimum Energy Performance, Option 2. Prescriptive Compliance: ASHRAE 50% Advanced Energy Design Guide?

A.

50,000 ft2 (4 645 m2) office project

B.

80,000 ft2 (7 432 m2) hospital project

C.

110,000 ft2 (10 219 m2) school project

D.

140,000 ft2 (13 006 m2) retail project

During the early stages of a LEED project, the team was able to reduce the number of lighting fixtures in classrooms by 25% because the project team selected a paint color whose light reflectance value was 75% instead of the initially proposed 64% value. This strategy is an example of applying which of the following credits to the project?

A.

IPc1: Integrative Design Process

B.

PRc1: Project Priorities

C.

EQc2: Occupant Experience

D.

MRc5: Construction and Demolition Waste Diversion

Which item is included in the reuse calculation for Materials and Resources Credit, Building Life-Cycle Impact Reduction?

A.

Floor decking

B.

Asbestos insulation

C.

Exterior glazing

D.

Plumbing fixtures