The contractor has submitted waste hauling reports for review in order to achieve Materials and Resources Credit, Construction and Demolition Waste Management. Which of the following materials on the documentation contribute towards the credit?

A.

Excavated soil

B.

Wood derived fuel

C.

Items sent to the local incinerator

D.

Alternate Daily Cover

What type of lighting can be used for 25% or less of the total connected lighting load for all regularly occupied spaces as a strategy to improve lighting quality?

A.

Low-mercury lighting

B.

Direct-only overhead lighting

C.

Light sources with a CRI of 80 or higher

D.

Low fixture glare

Every location in the U.S. identifies how many regional credits?

A.

Four

B.

Five

C.

Six

D.

Seven

For Energy and Atmosphere Credit, Advanced Energy Metering, what is the minimum amount of time that the metering system should store data?

A.

6 months

B.

12 months

C.

24 months

D.

36 months

Which of the following strategies can be used to reduce the internal load of a building?

A.

Decreasing lighting power

B.

Oversize the HVAC systems

C.

Install low reflective exterior facade

D.

Increase the insulating value of the glazing and window frame system

The energy-related systems analysis for Integrative Process credit for Core and Shell projects should include all system loads and occupants required by which Energy and Atmosphere prerequisite?

A.

Building-level energy metering

B.

Fundamental commissioning and verification

C.

Minimum energy performance

D.

Fundamental refrigerant management

The gross floor area of a LEED project should be no less than what percent of the gross land area within the LEED project boundary?

A.

3%

B.

1%

C.

2%

D.

4%

A project team wants to educate the facility manager on the installed building systems to improve Indoor Environmental Quality. They want the facility manager to maintain the systems so that they will continue to function as intended. Which of the following should be provided to the facility manager?

A.

Vendor invoices for mechanical equipment

B.

Preventive maintenance plan for the building

C.

As-built drawings and copies of material submittals

D.

A copy of the credit documentation for the credits that were approved by Green Business Certification Inc. (GBCI)

A building owner installs a building automation system (BAS) to allow programmable load control. Which of the

following credits can be pursued because of the installation?

A.

Energy and Atmosphere Credit, Demand Response

B Energy and Atmosphere Credit, Ongoing Commissioning

B.

Energy and Atmosphere Credit, Enhanced Commissioning

C.

Energy and Atmosphere Credit, Enhanced Refrigerant Management

A new school with a 20 car parking lot has set aside four preferred parking spaces for green vehicles. What else must the project team provide to achieve Location and Transportation Credit, Green Vehicles?

A.

Nothing; the project team has met the credit requirements

B.

Provide secure bike racks for 5% of the building occupants

C.

Provide an additional parking space for a low-emitting and fuel-efficient vehicle

D.

Provide qualifying electrical vehicle supply equipment in 2% of all parking spaces