In order to meet the minimum qualifications for Energy and Atmosphere Prerequisite, Fundamental Commissioning and Verification a Commissioning (Cx) agent must have completed the commissioning process activities for a minimum of how many similar projects?

A.

Zero

B.

One

C.

Two

D.

Three

A large residential building project is exploring strategies to reduce reliance on the municipal water supply. The design must ensure that reused water meets local health and safety standards and remains feasible within the project’s operating budget.

Which of the following considerations should the project team prioritize to effectively implement the water-reuse system while maximizing water efficiency?

A.

Install water meters to monitor the use of reclaimed water

B.

Conduct a feasibility study regarding the availability of alternative water sources on-site

C.

Assess the energy use of water-treatment technologies

Which of the following prerequisites or credits are affected by using plug-in devices when attempting to achieve Indoor Environmental Quality Credit. Thermal Comfort?

A.

Energy and Atmosphere Credit. Demand Response

B.

Energy and Atmosphere Credit. Advanced Energy Metering

C.

Energy and Atmosphere Prerequisite. Minimum Energy Performance

D.

Energy and Atmosphere Prerequisite. Building Level Energy Metering

Which of the following strategies can be used to decrease the envelope load of a building?

A.

Provide summer solar shading

B.

Maximize daylighting

C.

Decrease opaque wall area

D.

Use economizers for free cooling

Discussing the project goals to help identify the credits and options that the team should attempt is an example of

A.

documenting LEED credits

B.

creating the Basis of Design (BOD)

C.

developing the LEED Scorecard

D.

implementing the Commissioning (Cx) Plan

A LEED AP is evaluating whether Indoor Environmental Quality Credit, Acoustic Performance is feasible for a LEED

AP Building Design and Construction: Healthcare project. Which of the following groups of documents would best inform this decision?

A.

Airport flyover maps, mechanical plans, wall sections

B.

Patient records, wall sections, ceiling panel cut sheets

C.

Occupancy statistics, patient records, MRI machine specifications

D.

MRI machine specifications, mechanical plans, occupancy statistics

A project team is deciding on the impact of a proposed concrete walkway. Which of the following will be impacted as a result of adding the walkway?

A.

Site ' s impervious cover

B.

Project density calculations

C.

Erosion and sediment control plan during construction

D.

Air quality as a result of off gassing that occurs as concrete cures

The LEED project has a main entrance and two service entrances in an alley behind the building. Which entrances need non-smoking signage and at what maximum distance from the door(s) can the non-smoking signage be posted?

A.

At the main entrance, 10 ft. (3 m) from the door

B.

At the main entrance, 25 ft. (7.5 m) from the door

C.

At the main entrance and the two service entrances, 10 ft. (3 m) from the doors

D.

At the main entrance and the two service entrances, 25 ft. (7.5 m) from the doors

In Sustainable Sites Credit, Light Pollution Reduction, which factor is included in the lamp lumen uplight calculation?

A.

Total fixture power

B.

Site area of the project

C.

Quantity of installed luminaires

D.

Total fixture lumens below 90 degrees

The Chartered Institute of Building Services Engineers (CIBSE) Applications Manual 10 - 2005 provides guidance for which of the following?

A.

Replacing inefficient lighting fixtures

B.

Adopting natural ventilation as the sole servicing strategy

C.

Phasing out of equipment that uses CFC-based refrigerants

D.

Renovating with materials low in volatile organic compounds