Weekend Sale - Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: sntaclus

When is an appropriate time to generate the detailed technical design document when implementing Manufacturing Cloud?

A.

The detailed technical design document is completed after the business requirement document has been generated.

B.

The detailed technical design document should be ready before engaging the business users to gather requirements.

C.

The detailed technical design document should be completed after an organization goes live with Manufacturing Cloud.

What is the maximum number of sales Agreement that can be activated for the same period, containing the same Products and linked to the same Account?

A.

1

B.

50

C.

No defined limit

D.

10000

E.

128

Universal Containers has implemented Rebate Management and wants to define the Benefit information section of a Rebate Type Benefit. Which Sequence of Minimum and Maximum Range values would be valid?

A.

0 to 100

B.

101 to 200

C.

201 to 300

D.

301 to 400

Universal Containers (UC) is preparing to roll out its new Manufacturing Cloud. UC has asked a group of end users to conduct preliminary testing. A group of 12 users is conducting testing and must give the go-ahead to deploy all settings to the production environment.

Which items are necessary to conduct proper testing?

A.

Process scripts; Sandbox access; Communication guidelines

B.

Sandbox access; Test data; Process scripts

C.

Profile configuration; Process scripts; User permissions

Universal Containers is using Account Based Forecasting and expects a 5% increase in the market but has a target growth of 10%.

Where should the Account owner add the additional 5%?

A.

Update the Account Forecast to 10%.

B.

Set 5% value in Account Growth.

C.

Update the Market Growth to 10%.