In which component do you have to perform most of theconfiguration to set up SAP Asset Manager?

A.

SAP Cloud Platform

B.

SAP ERP

C.

SAP Mobile Platform

D.

SAP S/4HANA

You want to schedule a performance-based maintenance plan. Which parameters are mandatory? Note: There are 2 correct answers to this question.

A.

Shift factors

B.

Start counter reading

C.

Estimated annual performance

D.

Scheduling period

What can you assign in a notification item? Note: There are 2correct answers to this question.

A.

Only one object part

B.

One or more object parts

C.

One or more causes of damage

D.

Only one cause of damage

Which SAP UI technology is used for the technicianls job list?

A.

SAP GUI for Windows

B.

Web Dynpro

C.

SAPUI5

D.

SAP GUI for HTML

You have created a new equipment category, "linear", with the corresponding view profile. Which fields appear in the equipment linear data tab? Note: There are 3 correct answers to this question.

A.

Object network

B.

Unit of measure

C.

Start marker

D.

Segment

E.

Type of offset

The technical completion of the current maintenance order was posted with a delay of 5 days. What happens to the next planneddate if you set the shift factor for early completion to 100%?

A.

It is not shifted.

B.

It is postponed by 5 days.

C.

It is postponed by a full cycle (100%).

D.

It will be 5 days earlier.

You need to create a new functional location. Which actions can you perform with the SAP Fiori app Create Technical Object? Note:There are 3 correct answers to this question.

A.

Edit classification data and characteristics.

B.

Change a reference location.

C.

Assign a subordinate piece of equipment.

D.

Assign documents.

E.

Create a measuring point.

You cancel the technical completion of a work order. What are theeffects? Note: There are 2 correct answers to this question.

A.

Open purchase orders are recompiled.

B.

Open reservations are recompiled.

C.

Referenced notifications are put In Process again.

D.

Open purchase requisitions are recompiled

Which objects can you use in the safety measure list? Note: Thereare 2 correct answers to this question.

A.

Work approval

B.

Permits

C.

Documents

D.

Work clearance documents

What are the prerequisites to serialize a piece of equipment? Note:There are 3 correct answers to this question.

A.

Assign a serial number profile to the related material master.

B.

Assign a serial number profile to the equipment category.

C.

Add a serialized material to the equipment serial data view.

D.

Maintain a serial number for an existing equipment master.

E.

Add a serialized material to the construction type field of the equipment master.