Which objects can a personnel number be assigned to directly?Note: There are 2 correct answers to this question.

A.

Planner group

B.

Work center

C.

Business partner

D.

Equipment

Which operations are possible when you cancel the technical completion of a maintenance order? Note: There are 2 correct answers to this question.

A.

Change the priority.

B.

Cancel status Released.

C.

Book a goods receipt.

D.

Change the estimated costs.

Which activities can the technician perform with the Repair Malfunction SAPUI5 app? Note: There are 2 correct answers to thisquestion.

A.

Release. Print

B.

Put in Process.

Schedule

C.

Release. Start Work

D.

Complete. Close Report

You want to display additional document information within the document flow of a maintenance order. For which type of documentmust this be customized?

A.

Invoice

B.

Service entry sheet

C.

Purchase order

D.

Goods movement

You want to assign your maintenance orders to a WBS element.Which of the following statements are correct? Note: There are 2 correct answers to this question.

A.

The settlement receiver WBS element can be determined automatically.

B.

The assignment is always made to a network activity of theWBS element.

C.

The assignment always has to be made manually.

D.

The assignment can be made automatically.

Which parameter in a maintenance strategy do you use to set thestart/end date of the maintenance order?

A.

Initial/subsequent buffer

B.

Package offset

C.

Call horizon

D.

Package hierarchy

Which statement is correct when planning maintenance work thatis to be carried out by an external company?

A.

In the control key assigned to the order operation, the "Service" indicator must always be activated.

B.

A service master record must always be assigned to the external order operation.

C.

If you assign a control key with indicator "Service" for an external service, you have to enter the actual values via the service entry sheet.

D.

If you assign a control key for an external order operation, theactual values must always be entered as a goods receipt in the system.

Which parameter in the material master is a prerequisite for refurbishment?

A.

Valuation class 8000

B.

Valuation category C (condition-based)

C.

Valuation type H (origin)

D.

Valuation category B (in-house/external procurement)

The planner adds stock materials in the maintenance order. Which statements regarding reservations in maintenance orders are correct? Note: There are 2 correct answers to this question.

A.

Open reservations can be cleared when a maintenance order operation is finally confirmed.

B.

For the combination of order type and planner group you can decide when reservations are created.

C.

All open reservations are closed when the maintenance order isset to TECO.

D.

Reservations are created only after a material availability checkhas been performed.

Which scheduling parameters are used in a multiple-counter plan? Note: There are 2 correct answers to this question.

A.

Scheduling period

B.

Factory calendar

C.

Start date

D.

Scheduling indicator