Which of the following can be used to calculate and update interest in SAP project system?

There are 2 correct answers to this question.

Response:

A.

Planned interest calculation

B.

Actual interest calculation

C.

Compound interest calculation

D.

Result analysis

Which manual cost planning method is used in WBS?

There are 3 correct answers to this question.

Response:

A.

Unstructured planning

B.

Overall planning

C.

Detailed planning

D.

Unit costing

Which of the following decides whether networks can be header assigned or activity-assigned?

There are 2 correct answers to this question.

Response:

A.

Order type

B.

Plant

C.

Billing type

D.

Network structure

Project System has its own Organizational structure, which can be a matrix structure.

Please choose the correct answer.

Response:

A.

True

B.

False

Which of the following cost planning transactions are related to Account assignment?

There are 3 correct answers to this question.

Response:

A.

Invoice posting

B.

Goods movement

C.

Confirmations

D.

Purchase requisitions

What are the two basic elements that SAP Project system provides for mapping the structures of projects?

There are 2 correct answers to this question.

Response:

A.

Networks

B.

Project plans

C.

Sub tasks

D.

Work break down structures

Which types of networks store all the activity and material component costs at the network header level and behave in the same way as all other order categories?

Please choose the correct answer.

Response:

A.

Order header networks

B.

Order category networks

C.

Assignment networks

D.

Header assigned networks

An activity-relationship-activity path is cyclical and you are not able to schedule the network. Which analysis tool enables you to detect cyclical relationships and correct them?

Please choose the correct answer.

Response:

A.

Activity analysis tool

B.

Relationship analysis tool

C.

Cycle analysis tool

D.

Loop analysis tool

In which type of project stock G/L account determination for project stock is controlled differently from collective stock using specific valuation classes for sales order stock and project stock in the material master?

There are 2 correct answers to this question.

Response:

A.

Valuated project stock

B.

Non-valuate project stock

C.

Sales order stock

D.

Purchase order stock

Assume a scenario where in, during the planning phase you entered basic dates for WBS elements, for instance by creating graphical time bars in the project planning board and as a result in the execution phase you have an option to set the actual dates in the sameway in the project planning board.

What is the status that must be set before you can enter actual start and actual end dates?

There are 2 correct answers to this question.

Response:

A.

Partially released

B.

Released

C.

Partially set

D.

Partially finished