How many power connections are required for the FlashArray//XL chassis?
For FlashArray//XL, which 2 PCIe slots should be used for DFS connectivity?
What is the rack unit height of a FlashArray//XR2/3?
An Implementation Engineer performing an inventory of hardware for an NDU from an FlashArray//X70R2 to an FlashArray //X90R3 and discovers a complete FlashArray//X90R3 was shipped in place of an NDU kit. What is the minimum hardware the Implementation Engineer should use from this array to complete the NDU?
Which action should an Implementation Engineer take to confirm that all volumes connected to a host are automatically in a protection group?
Which Purity command can be used to validate I/O is balanced across initiators?
During a FlashArray//X to FlashArray//XL hardware upgrade, when should the Implementation Engineer insert the DFMd modules into the FlashArray//XL?
For FlashArray//XL, which PCIe card slot is reserved for control upgrades?
An Implementation Engineer has completed cabling a DirectFlash Shelf (DFS) to the FlashArray. Which command should the Implementation Engineer run to verify that the cabling was completed correctly?
A client needs to upgrade Purity on their FlashArray, but is unable to wait for an available upgrade date from support. What action should the customer take?