An Implementation Engineer is onsite to add two 4-port FC cards to a FlashArray//X20R3. In what state should the controller be in before performing the card add procedure?
What is the redundancy of the FlashArray//XL PSUs?
After an Implementation Engineer installs a new FlashArray and runs health checks, they see that Phonehome and Remote Assist are NOT working correctly.
Which outbound port needs to be open for all management ports (physical and virtual)?
An Implementation Engineer is planning to add a DirectFlash Shelf to a FlashArray//XL with an existing DirectFlash Shelf. Which PCIe slot must be used for shelf connectivity?
For FlashArray//XL, which 2 PCIe slots should be used for DFS connectivity?
When should a FlashArray support case be opened?
Which default speed FC SFPs are shipped in FlashArray//XCR4 FC arrays?
Prior to running the puresetup newarray command, which command should an Installation Engineer run on a new install of an //XR4 array?
An Implementation Engineer is scheduled to install a FlashArray and a DirectFlash Shelf (DFS).
What action should the Implementation Engineer perform?
On a FlashArray//XR50R2/3 Fibre Channel (FC) array, what is the default type and placement of the PCIe FC card?