Spring Sale Special - Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: sntaclus

At the completion of an upgrade, what command should the Implementation Engineer run to send phonehome logs?

A.

purearray phonehome --send-logs

B.

purelogs --send-all

C.

purearray phonehome --send-today

D.

purearray send --phonehome

An Implementation Engineer has completed cabling a DirectFlash Shelf (DFS) to the FlashArray.

Which command should the Implementation Engineer run to verify that the cabling was completed correctly?

A.

storage_view.py enclosures

B.

storage_view.py list

C.

storage_view.py config

D.

purehw list --enclosures

Which command should the Implementation Engineer run to set the maintenance tag?

A.

puremaintenance schedule array --timeout < timeout >

B.

puremaintenance tag --maintenance

C.

purealert tag --schedule --maintenance

D.

puremessage flag set --maintenance

An Implementation Engineer is performing an inventory for an NDU from a FlashArray//X70R2 to a FlashArray//X70R4 and discovers that a complete FlashArray//X70R4 was shipped instead of an NDU kit.

What is the minimum hardware the Implementation Engineer should use from the new array to complete the NDU?

A.

Controllers and power supplies

B.

Controllers and NVRAM

C.

Controllers

D.

Controllers, NVRAM, and chassis midplane

Which action should an Implementation Engineer take to confirm that all volumes connected to a host are automatically in a protection group?

A.

Add the volumes as members of a protection group.

B.

Add a new volume each time it is attached to the host.

C.

Add a host as a member of a protection group.

After running puredb run giveback --safe command once CT0 has been upgraded, how long should the Implementation Engineer wait before continuing with the controller upgrade?

A.

3 minutes

B.

5 minutes

C.

10 minutes

An Implementation Engineer is getting ready to install four DFMs into a 16-module efficiency bundle and notices that the new modules are DFMDs while the installed modules are DFMs.

What should the Implementation Engineer do to get the array using a 20-module wide write group?

A.

Install the four new DFMDs, run puredrive admit and have support set the tunable puretune --set allow_dfmd_in_dfm_wwg 1 < CASE > .

B.

Work with the account team to ship DFMs instead of the DFMDs.

C.

Install the four new DFMDs and run puredrive admit.

D.

Insert the DFMDs into a separate swing shelf to isolate them from the DFMs.

What command should the Implementation Engineer run to view NVRAM install and update status?

A.

puredrive list

B.

purehw list --all

C.

purearray list

D.

purefw list

During a deployment, an Implementation Engineer attempts to name a FlashArray corporate Lab-0L, but the array rejects the name. What is the reason for the failure?

A.

FlashArray names cannot include hyphens.

B.

FlashArray names cannot include numbers.

C.

FlashArray names cannot contain spaces.

Prior to running the puresetup command, which command should an Installation Engineer run on a new install of a FlashArray//XR4 array?

A.

pureboot list

B.

cobalt check . py

C.

purehw list