Month End Sale - Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: sntaclus

Showitoff is an organisation specialising in the design and production of wall decorating materials for the domestic market. During an ISO 14001 certification audit of the site, the auditor comes across an open, walled area just outside the maintenance department. It contains various scraps of wood and metal as well as several rusty components. They are lying on an oily floor. When asked about it, the EMS Manager states that he presumes that the materials come from maintenance work.

The auditor interviews the Maintenance Manager in his department. He notes that shelves containing various spares are well labelled and neatly stacked. He asked about the "dump" outside and is told that it contains some excess materials that the Manager likes to keep in case they come in handy at some stage. The auditor points out that the "dump" might be classed under regulations as a landfill site, which requires an operating licence. The Maintenance Manager is not aware of such a licence.

Which three statements represent good audit practice?

A.

The auditor should check whether the organisation has permission to operate a landfill site.

B.

The auditor should ask the Maintenance Manager to clean up the "dump".

C.

The auditor should advise the organisation to get rid of all the "dumps".

D.

The auditor should check the information given by the Maintenance Manager with the EMS Manager.

E.

The auditor should refer the organisation to the relevant authorities.

F.

The auditor should consider surveying more areas of the site for other "dumps".

G.

The auditor should raise a nonconformity against ISO 14001.

You are conducting a Stage 2 certification audit of VitalSpark, a pharmaceutical organisation manufacturing vitamins and other healthcare medicines. In a separate area in the centre of their large site, a supplier produces oxygen supplies piped directly into the manufacturing processes of VitalSpark. They also deliver oxygen in bulk tankers to other customers. When you review the environmental aspects register, you find that the only environmental aspect recorded for this arrangement relates to the heavy goods vehicles of the supplier transiting the site.

You ask the EMS Manager about the environmental consequences to VitalSpark of this arrangement and are told that they are not significant since the supplier has its own services for water, sewage, waste and energy. The EMS Manager tried unsuccessfully to communicate with the supplier who is located inside the VitalSpark site and outside the scope of the EMS.

You raise a non-conformance against clause 6.1.2 of ISO 14001:

"VitalSpark does not maintain documented information on aspects/impacts related to activities, products and services of the oxygen supplier."

Which combination of two of the following actions proposed by VitalSpark would permit you to close out the nonconformity?

A.

VitalSpark will retrieve environmental data on a monthly basis from the on-site supplier.

B.

VitalSpark will update its documented information on aspects/impacts to include those related to the oxygen supplier.

C.

The oxygen supplier will be requested to implement an ISO 14001 management system within the next 3 months.

D.

VitalSpark will expand its audit programme to include audits of the oxygen supplier's organisation.

E.

VitalSpark will suggest that the oxygen supplier should undertake training in environmental awareness.

F.

The oxygen supplier will be requested to undertake a full environmental survey of its processes.

Which two audit characteristics are features of a Stage 1 initial certification audit?

A.

To conduct an analysis of the organisation's environmental system processes to determine compliance obligations.

B.

Except for a pandemic or other natural disaster, this audit must be performed onsite at the auditee's location.

C.

Gaps in the EMS against the requirements of ISO 14001 are reported as 'areas of concern'.

D.

The audit team's recommendation regarding certification is the key outcome of this stage.

E.

Reviewing some of the auditee's documentation.

F.

The purpose of this audit is to determine if the EMS is effectively implemented and maintained.

XM, a chain of 25 petrol stations, established an EMS following the requirements of ISO 14001, which was third-party certified 10 years ago. You are performing an internal audit before the fourth certification cycle.

During the audit to the EMS Manager (EM), the following dialogue takes place:

You: Could you please give me some details on the inspection of underground tanks in each station?

EM: It's very simple. There is a regulation that requires an annual leak inspection.

You: Who performs these inspections?

EM: I personally contract the inspectors and submit the results to the local authority. These are the certificates submitted last year.

You: I see only 22 certificates. There are three missing.

EM: The tanks of those three stations will be removed next year and replaced by new ones. I phoned the local authority and they told me that I do not need to send any report of the tanks that will be changed.

Which one of the following would be your next question?

A.

Have you planned any final disposal of the tanks to be removed?

B.

Can I see the contract XM signed with the inspector?

C.

Did you ask the local authority to send a written confirmation of their decision?

D.

Can I see the plan for the installation of the new tanks?

ABC is a large lubricant oils manufacturer located in country A. Due to tax exemption and other economic issues, they decided to move the whole plant to a neighbouring country B. They moved every single piece of the plant (equipment, systems); the new plant has the same layout, the same dimensions, the same suppliers of raw materials and the same customers. Even more, most personnel accepted to move to country B.

They operate a third-party certified EMS; the certificate was transferred to the new plant after a half-day audit from the certification body. You are auditing ABC's EMS in the new location, representing ABC's largest customer. When interviewing the Environmental Manager (EM), you ask:

You: Can I see the plan you developed to keep under control the impact of the EMS due to the change of site?

EM: We listed all elements and processes of the EMS that might need to be changed and selected those that we considered needed a careful review and probably a revision.

Below you will find that list; select six that you consider will need to be revised.

A.

Legal requirements

B.

Requirements ABC chooses to comply with

C.

Environmental conditions

D.

Personnel competence

E.

External issues related to the context of the organisation

F.

Maintenance of infrastructure

G.

ABC's Environmental policy

An audit team leader arrives at a steel fabrication organisation that manufactures fire escape stairs to carry out a Stage 2 certification audit. At a meeting with the EMS Manager, she is told that they have won their biggest contract from a construction organisation to manufacture and install fire escape stairs. They appointed a subcontractor to perform the installation work. The EMS Manager wants the ISO 14001 audit extended to cover the installation site.

Select which one of the options is the correct response by the auditor.

A.

We have used all our allocated time in preparation for this audit so how can we extend the audit scope?

B.

Do you realise that this involves an extension to the scope of the audit and will require an application process?

C.

Would you write to my audit programme manager with this request?

D.

Can you arrange to bring the installation team here so that we can include this in the audit?

You are auditing the ISO 14001 management system of a primary school (School 21st Century) located in downtown Lima, Peru. There are 400 students, attending classes from 9 am until 5.30 pm.

You have presented a nonconformity at the closing meeting:

Non-conformity - No environmental aspect has been identified related to the impact of the education provided by the school on students' awareness (as future adults) related to generic environmental issues.

Select the three best acceptable corrections that the school may take.

A.

Revise the school's environmental policy to include environmental concerns

B.

Ask the National Environmental Agency for reading materials to give to students before the lecture by the expert

C.

Add the education on generic environmental issues to the list of environmental aspects of the school's EMS

D.

Establish environmental objectives for the school

E.

Hire an environmentalist next month to deliver a couple of lectures on the environment to all employees of the school, except students

F.

Thoroughly review the syllabus for next year to include environmental issues whenever appropriate

G.

Review the procedure for waste management in the school

A group of 22 Italian restaurants in downtown San Francisco (US) established an EMS following the requirements of ISO 14001. You are performing an internal audit before the fourth certification cycle. The audit plan included an audit of the General Manager (GM) as the last interview before the closing meeting. During the interview with the GM, you audit clause 10.3 (Continual improvement). The dialogue is as follows.

You: Could you please tell me how did you improve the EMS to enhance environmental performance (Clause 10.3)?

GM: One way to improve the EMS is to improve one or several of its processes. We decided to improve the water-consuming processes in all our branches. We use water in many of our processes (e.g. to wash our kitchens, our cutlery, plates, and glasses, to keep our floors clean). The idea was to review these processes in detail to reduce the amount of water used per customer. Each of the 22 branches sent us their results, we analysed the data and found out that the average water consumption per customer was reduced by 13%; therefore, we improved our environmental performance. We are happy about that.

You: What about the results in each branch?

GM: Have a look at this table:

Analysing this table, what would be your decision related to raising nonconformities to clause 10.3? Select two.

A.

I would raise a nonconformity for branches in D

B.

I would raise a nonconformity for branches in C and D

C.

I would raise an opportunity for improvement for branches in B, C, and D

D.

I would raise a nonconformity for the whole group

E.

I would raise a nonconformity for branches in B

F.

I would not raise any nonconformity

A chain of 10 paint shops in a city has established an EMS following the requirements of ISO 14001, which was third-party certified 10 years ago. You are performing a second-party audit. The audit plan included an interview with the General Manager (GM). The dialogue was as follows:

You: Hi, good evening, I have seen a well-developed environmental risk assessment process. However, I did not find the identification of emergency situations included in the results of this process. The Environmental Manager (EM) could not provide me with an acceptable answer to this question.

GM: The EM joined us 2 months ago, and he may not know some decisions we made some time ago, when we first certified our EMS. During those days, I met with all 10 supervisors and asked them what the emergencies were that they feared most. They unanimously said: fire. That was it. This is the only emergency we care of. As far as I remember we do not test the plan very often because the supervisors of all our 10 shops know it very well. The auditors of our certification body accepted this. We did not have a fire in the last 10 years.

What evidence would you need to review to determine conformity with ISO 14001 in this scenario? Select six.

A.

More details on whether the risk assessment process was applied to emergencies

B.

Records of the specific fire combat training of workers

C.

Reports of audits from the certification body

D.

General competence records of all 10 supervisors

E.

Minutes of the meeting with supervisors where a fire was determined as the only emergency situation

F.

Shops that have tested the plan in the last 10 years

G.

Reports of the management reviews

An oil organisation has a natural gas treatment plant on land crossed by several small rivers. On one particular day, after heavy rainfall for 48 hours, some of those rivers burst their banks and flooded the water treatment facilities of the plant. The oil-contaminated water reached some scarcely populated areas nearby.

Soon after, an internal audit was carried out to particularly analyse this event that was considered a nonconformity. There were no records of such heavy rainfall in the past 200 years.

Which three of the following actions are 'corrections'?

A.

Offer loans to the persons affected to build new houses far from the plant

B.

Revise the existing emergency plan

C.

Clean up the houses of the persons affected

D.

Clean up the affected land

E.

Build up some additional protection to the water treatment plant

F.

Relocate the water treatment plant to lower ground

G.

Reinforce the riverbanks with cement