Spring Sale Special - Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: sntaclus

Which of the following are the main reasons for fiber attenuation?

A.

Refraction and reflection

B.

Scattering and absorption

C.

Chromatic dispersion (CD) and polarization mode dispersion

D.

Small channel spacing

What is the metro area network?

A.

The metro area network is that portion of network that passes through a city to provide connections to several customers.

B.

The metro area network is located between access and core domains.

C.

The metro area network is made of OCS/SWDM nodes only, as no pure photonic nodes are used here.

D.

The metro area network is located in between two access area networks and made of photonic nodes only (no OCS/SWDM nodes are used there).

What is the meaning of demand in EPT?

A.

Demand refers to the amount of OTN interfaces within a single network element.

B.

Demand refers to the required capacity of a single network element in terms of bandwidth.

C.

Demand refers to the required number of trails to be automatically created to meet design requirements.

D.

Demand refers to one or more client signal.

What is the block that converts the colorless (or black and white) client signal to a specific optical channel in a WDM system?

A.

Wavelength router (WR)

B.

Optical transponder (OT)

C.

Static filter device (SFD)

D.

Dispersion compensation module (DCM)

What is the purpose of the NFM-T node synchronization?

A.

The partial or full node synchronization allows several entities/items defined at node level to be retrieved into the NFM-T database (upload).

B.

The partial or full node synchronization allows several entities/items defined at NFM-T level to be written into the node database (download).

C.

The partial or full node synchronization allows several entities/items defined at EPT level to be retrieved into the NFM-T database (upload from design).

D.

The partial or full node synchronization allows several entities/items defined at NFM-T level to be exported into an XML file, to be used as input for EPT (download to design).

With reference to the power budget, what is the meaning of receiver dynamic range?

A.

It is the minimum power to be received for a given BER.

B.

It is the range between the receiver overload power and its sensitivity.

C.

It is the range between the maximum transmit power and the minimum transmit power.

D.

It is the maximum receiver power to prevent an overload.

Which application generates the commissioning file(s)?

A.

NFM-T

B.

NSP

C.

CPB

D.

EPT

Is it possible to mix PSS-24x and PSS-8x shelves In an SWDM configuration?

A.

Yes, as both can be equipped within the same node

B.

No, as they are not compatible and cannot be used within the same node

C.

Yes, but the PSS-24X shelf must be configured as a master

D.

Yes, but the PSS-8X shelf must be configured as a master

Is it possible to select the fiber type independently for each segment while designing a network in EPT?

A.

Yes, during the link creation through the wizard

B.

No, a unique type is allowed per design for all segments

C.

No, as the fiber type is selected for links only and it's one for whole design

D.

Yes, during the segment creation phase or editing

Which of the following statements about coherent transmission in WDM technology is TRUE?

A.

Coherent systems need carrier phase information at the receiver.

B.

Only multi-mode fibers can be used with coherent transmissions.

C.

The channel allocation is flexible, according to the channel size of the signals.

D.

At each receiver, a dispersion compensation unit is often necessary, depending on the fiber length.