Weekend Sale - Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: sntaclus

Which of the following is true about Oracles?

A.

Sometimes old version of a product can be used as an Oracle

B.

Oracles help in reproducing the irreproducible bugs

C.

Oracles are derived from the design

D.

Oracles can be generated automatically using data generators

Which of the following CORRECTLY matches the roles and responsibilities in a formal review?

A.

Facilitator - Fixes defects in the work product under review

B.

Scribe - Collates potential defects found during the individual review activity

C.

Review Leader - Creates the work product under review

D.

Author - Identify potential defects in the work product under review

In which one of the following test techniques are test cases derived from the analysis of the software architecture?

A.

Black-box test techniques.

B.

Experience-based test techniques.

C.

Checklist-based test techniques.

D.

White-box test techniques.

Which of the following activities is NOT a pan of the fundamental testing process?

A.

Archiving automation code

B.

Test status reporting

C.

Test process improvement

D.

Build release and maintenance

Which of the following can be considered a VALID exit criterion?

I Estimates of defect density or reliability measures.

II. The completion and publication of an exhaustive Test Report.

III. Accuracy measures, such as code, functionality or risk coverage.

IV Residual risks such as lack of code coverage in certain areas.

A.

I, III, IV

B.

I, II, III

C.

III, IV

D.

II, III, IV

A test manager decided to skip static testing since he believes bugs can be found easily by doing dynamic testing. Was this decision right or wrong?

A.

The decision was wrong. Ensuring quality mandates that static testing is performed after performing the dynamic testing.

B.

The decision was right. Static testing is usually redundant if a product is planned to go through a full-cycle of dynamic testing.

C.

The decision was right. Most of the bugs are easier to identify during the dynamic testing.

D.

The decision was wrong. Static testing can find defects early in the development process, reducing the overall cost of testing and development

Which of the following lists factors That contribute to PROJECT risks?

A.

skill and staff shortages; problems in defining the right requirements, contractual issues.

B.

skill and staff shortages; software does not perform its intended functions; problems in defining the right requirements.

C.

problems in defining the right requirements; contractual issues; poor software quality characteristics.

D.

poor software quality characteristics; software does not perform its intended functions.

The following incident report that was generated during test of a web application.

What would you suggest asthe most importantreport improvement?

Defect detected date: 15 8.2010

Defect detected by: Joe Smith

Test level System test

Test case: Area 5/TC 98

Build version: 2011-16.2

Defect description After having filled out all required fields in screen 1, t click ENTER to continue to screen2Nothing happens, no system response at all.

A.

Add information about which web browser was used

B.

Add information about which developer should fix the bug

C.

Add the time stamp when the incident happened

D.

Add an impact analysis

Which of the following statements best describes the difference between product risk and project risk in software testing?

A.

Product risk refers to the risk associated with the project's schedule, budget, and resources, while project risk refers to the risk associated with the quality and functionality of the software product.

B.

Product risk refers to the risk associated with issues such as delays in work product deliveries, inaccurate estimates, while project risk refers to the risk associated with the project's schedule, budget, and resources.

C.

Product risk and project risk are essentially the same and can be used interchangeably.

D.

Product risk refers to the risk associated with delays in elements such as work product deliveries and inaccurate estimates, while project risk refers to the risk associated with issues such as user dissatisfaction.

Which ONE of the following is a GOOD testing practice that is INDEPENDENT of the chosen SDLC (Software Development Life Cycle) model?

A.

Testers are involved in reviewing work products as soon as the final version of this documentation is available so that this earlier testing and defect detection can support the “shift-left" strategy.

B.

Test analysis and design for a specific test level begin during the corresponding development phase of the SDLC, allowing testing to follow the principle of late testing.

C.

For every software development activity, there is a corresponding testing activity, ensuring that all development activities are subject to quality assurance.

D.

Different test levels have specific and overlapping test objectives, allowing tests to be appropriate to specific test object types while managing redundancy.