Pre-Winter Sale Special - Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: sntaclus

Which statement about HPE SimpliVity is true?

A.

HPE SimpliVity 380 Gen11 cluster with compute nodes requires the same CPU in all nodes.

B.

Mixing AMD and Intel chassis in the same federation is fully supported.

C.

A single AMD-based HPE SimpliVity node can support up to 4 non-HPE SimpliVity servers.

D.

A single Intel-based HPE SimpliVity node can support up to 8 non-HPE SimpliVity servers.

You are designing a solution for a customer that will support a virtualization workload based on HPE Synergy. Your customer has the following requirements:

    Dual-socket HPE Synergy compute nodes running ESXi 8.x with maximum memory supported

    Each node should have access to shared storage from HPE Alletra Storage MP B10000

    All virtual machines should be protected against host failure

    All virtual machines with vGPU must be protected with Fault Tolerance

    All compute nodes should boot from drives located in the D3940 Storage Modules protected with RAID 1

    All frames should be managed as one logical enclosure to simplify management

    All compute nodes should support two network ports with the maximum Ethernet connectivity speed

You are reviewing a proposal that you must verify. The proposal contains:

    3 HPE Synergy 12000 frames

    2 HPE Synergy Composer2 modules

    4 HPE Virtual Connect SE 100Gb F32 Modules for Synergy

    4 HPE Synergy 50Gb Interconnect Link Modules

    3 HPE Synergy D3940 Storage Modules, each with 20 SSD drives

    1152 core vSphere Enterprise Plus subscriptions

    36 HPE Synergy 480 Gen11 compute nodes

Each SY480 Gen11 is configured with:

    A single Platinum CPU with 32 cores

    HPE Synergy 6820C 25/50Gb Converged Network Adapter

    HPE Synergy 5830C 32Gb Fibre Channel Host Bus Adapter

    HPE MR416i-o Gen11 12G SAS Mezzanine Controller

Which two statements are true regarding the proposal? (Select two.)

A.

2 HPE Synergy 50Gb Interconnect Link Modules should be removed from the proposal, as the total number of interconnects required is six.

B.

HPE MR416i-o Smart RAID controller can be removed because there are no external SAS disk enclosures included in the proposal.

C.

Two HPE Virtual Connect SE 100Gb F32 Modules for Synergy can be removed from the proposal because all requirements are met without them.

D.

To access HPE Alletra MP B10000 arrays, FC upgrade licenses for HPE Virtual Connect SE 100Gb F32 Modules for Synergy must be purchased.

E.

vSphere Enterprise Plus subscriptions can be replaced with vSphere Standard subscriptions.

You have proposed that your customer adopts HPE VM Essentials as an alternative hypervisor, but they still want to utilize their existing HPE Synergy 480 Gen10/Plus for existing vSphere workloads.

How can your customer manage both environments from a single management platform?

A.

Use the HPE VM Essentials Manager to manage both vCenter and HPE VM Essentials.

B.

Use the Data Services Connector to connect HPE OneView Composer to HPE GreenLake and HPE VME.

C.

Use the HPE VM Essentials plugin for vCenter to manage both platforms.

D.

Use the HPE GreenLake Data Services disconnected option to manage vCenter and HPE VM Essentials.

Your customer wants to implement a disaster recovery solution for their virtualization workload. They also want to implement a protection method that will protect the workload in case of a site failure.

Their existing environment includes the following configurations:

    All ESXi systems are located in the same datacenter

    Virtual machines are protected by an HA cluster

    Some of the VMs are protected with Fault Tolerance

    HPE Synergy 480 Gen11 is the compute platform

    HPE Alletra Storage MP B10000 array for storage

    Orchestrated failover for all VMs using VMware tools

The customer plans to replicate the same setup at the second site. The total number of virtual machines that must be protected is 200. Your customer also expects an RPO of 0.

Which component or configuration is a necessary part of a solution that will meet all customer requirements?

A.

HPE Synergy frames from the secondary site added to the logical enclosure configured in the primary site.

B.

Storage policy-based management (SPBM) must be configured for a group of the virtual machines.

C.

Synchronous replication configured between sites to replicate the volumes used to build the datastores.

D.

Asynchronous replication configured between sites used to replicate the volumes used to build the datastores.

Your customer has a requirement to support 500K IOP/s write speeds in their environment.

What change should you make to the configuration to achieve this?

A.

Replace the nodes with B91160 model and add additional drive shelf and more drives.

B.

Replace the nodes with B91130 model and add additional drive shelf.

C.

Increase the amount of drives supported to achieve the requirement.

D.

Replace the nodes with B10230 model and add additional drive shelf and more drives.