Weekend Sale - Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: sntaclus

A customer needs to purchase a redundant pair of SAN switches for their virtualization environment. The customer requires a total of eight 16 Gbps FC storage ports and eighteen 8 Gbps FC host attachments.

Which switch meets the customer’s needs at the lowest cost?

A.

HPE StoreFabric SN6010C 48-port Switch

B.

HPE StoreFabric SN6010C 12-port Switch with an On Demand Port Activation License

C.

HPE 8/24 SAN Switch 16-port Switch with an 8-port Upgrade License

D.

HPE 8/24 SAN Switch 16-port Switch

Which two HPE applications are installed on Windows operating systems with intelligent Provisioning? (Choose two.)

A.

Lights-Out Online Configuration Utility

B.

OneView

C.

UEFI Control Suite

D.

Intelligent Management Center

E.

Smart Storage Administrator

You are troubleshooting a HPE ProLiant rack-mount server. You notice that all front-panel status LEDs flash simultaneously.

What does this indicate has occurred on the server?

A.

a power fault

B.

an overheated system

C.

an invalid memory configuration

D.

an iLO-initiated reboot

You are working on a server, and you notice that the blue UID light on the server is flashing slowly.

What does this indicate?

A.

The host server is in standby mode

B.

The system is being managed remotely

C.

The host has rebooted and is performing POST actions

D.

The system is experiencing power issues

A customer needs to improve throughput performance of iSCSI traffic on their Layer 2 switch. Which feature should the customer implement at the switch level?

A.

Jumbo frames

B.

Oversubscription

C.

SMB Direct

D.

Remote Data Memory Access

You are installing a combined server and storage solution at a customer location. What must you keep in mind regarding the typical requirements for the location? (Choose two.)

A.

Room temperature must not exceed 35 °C (95 °F)

B.

Rack tie kit should be installed on the rack for proper airflow

C.

UPSs should be installed at the top of the rack for top mounted power feed

D.

There must be at least a 10 cm (4 in) clearance space at the front and back of the components within the racks

E.

Rack doors must be unlocked for easy component removal and maintenance

You plan to install an HPE ProLiant DL360 Gen10 in an environment with an ambient temperature of 45 °C (113 °F).

Which additional option is required?

A.

500W Flex Slot Platinum PS Kit

B.

M.2 Solid State Enablement Kit

C.

Gen10 Bezel Kit

D.

High Performance Fan Kit

You are installing an HPE StoreOnce backup system in a customer’s environment. They need a simple and cost-effective method to centralize and automate the backup of multiple servers (file, virtualization, database). They also need the ability to integrate with an existing third-party backup software.

How must you configure the StoreOnce system to meet the customer’s requirements?

A.

block device

B.

replication target

C.

NDMP target

D.

VTL device

A customer needs to enable HPE Proactive Care and automated case creation for server hardware failures in their OneView environment.

Which step do you need to complete in OneView to accomplish these tasks?

A.

Enable remote support from the Settings page.

B.

Apply the OneView Advanced monitoring license.

C.

Add the hosts to the managed devices group.

D.

Configure proactive scan reports.

Which statement is true regarding configuring memory in an HPE ProLiant server?

A.

LRDIMMS in 64 GB and 128 GB can be mixed.

B.

RDIMM and LRDIMMs can be mixed in one system.

C.

Different capability DIMMs of the same speed can be mixed.

D.

The first CPU memory channel must be fully populated before the second.