A customer needs to purchase a redundant pair of SAN switches for their virtualization environment. The customer requires a total of eight 16 Gbps FC storage ports and eighteen 8 Gbps FC host attachments.
Which switch meets the customer’s needs at the lowest cost?
Which two HPE applications are installed on Windows operating systems with intelligent Provisioning? (Choose two.)
You are troubleshooting a HPE ProLiant rack-mount server. You notice that all front-panel status LEDs flash simultaneously.
What does this indicate has occurred on the server?
You are working on a server, and you notice that the blue UID light on the server is flashing slowly.
What does this indicate?
A customer needs to improve throughput performance of iSCSI traffic on their Layer 2 switch. Which feature should the customer implement at the switch level?
You are installing a combined server and storage solution at a customer location. What must you keep in mind regarding the typical requirements for the location? (Choose two.)
You plan to install an HPE ProLiant DL360 Gen10 in an environment with an ambient temperature of 45 °C (113 °F).
Which additional option is required?
You are installing an HPE StoreOnce backup system in a customer’s environment. They need a simple and cost-effective method to centralize and automate the backup of multiple servers (file, virtualization, database). They also need the ability to integrate with an existing third-party backup software.
How must you configure the StoreOnce system to meet the customer’s requirements?
A customer needs to enable HPE Proactive Care and automated case creation for server hardware failures in their OneView environment.
Which step do you need to complete in OneView to accomplish these tasks?
Which statement is true regarding configuring memory in an HPE ProLiant server?