Weekend Sale - Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: sntaclus

How can an environment variable value be updated? (select all that apply)

A.

By using the Internal - Environment Variables business object

B.

By changing the Blue Prism Server configuration

C.

By updating the value in Control Room

D.

By updating the value in Credential Manager.

E.

By updating the value in System Manager

Which of the following statements are correct when considering an elements attributes in Application Modeller?

(Select all items which apply)

A.

The attribute list will always contain the same entries regardless of the target application or element

B.

The initial selection of attributes made by Blue Prism will always be the optimum attribute set to use to match the element

C.

The attributes displayed in Application Modeller are provided to Blue Prism by the target business application

D.

Attributes which are included in the element match criteria contain a tick in the Match column of Application Modeller

A process is currently scheduled to run every day but needs to be temporarily stopped for 3 months According to best practice, how should this be done?

A.

Retire the Schedule for the required period. then Unretire it

B.

Clone the Schedule and set a new start date on the clone

C.

Set an End Date on the Schedule, then create a new Schedule to Start after 3 months

D.

Pause the Schedule for the required period

Which of the following indicates a case has been worked successfully in a Work Queue?

B)

C)

D)

A.

Option A

B.

Option B

C.

Option C

D.

Option D

Examine the following Blue Prism Process diagram which is intended to get the date of the previous day as a date value:

The Calculation stage Properties window is provided below:

Which are the following statements about this process diagram are correct?

A.

None of these statements are correct

B.

If the 'Result Date' data item is configured as a Text data type, then a 'data type mismatch' Internal Exception will be thrown on execution of the Calculation stage

C.

If the 'Result Date' data item is configured as a Date data type, then the 'Result Date' data item will be set to the date of the previous day on execution of the Calculation stage

D.

On execution of the Calculation stage, a 'Failed to evaluate expression' Internal Exception will be thrown

How can input data be added to a Startup Parameter before the process runs?

A.

Navigate to Startup Parameters in the Control Room Scheduler

B.

Navigate to Startup Parameters in the System area and select the correct Process

C.

Right-click the item in the Work Queue and select Startup Parameters

D.

Right-click the session in Control Room and select Startup Parameters

Consider the following flow in an object:

Which of the following statements are true?

A.

There just needs to be a wait stage after the start stage to correct this action.

B.

There should be a wait stage after every stage in this flow (i.e. after the navigate, read, write stages.

C.

If during testing in object studio this flow works, no additional wait stages should be added as they will slow the interface down.

D.

There should be an intelligent wait stage after the start stage and after any stage that cause the application we are interfacing with to change

Which of the following Blue Prism stages can be found in Object Studio but not in Process Studio? (Select ail items which apply)

A)

B)

C)

D)

E)

F.

A.

Option A

B.

Option B

C.

Option C

D.

Option D

E.

Option E

How would you run a Blue Prism Process on a virtual Digital Worker?

A.

Through Control Room

B.

Through the Digital Worker Management Console

C.

Through System Manager

D.

Through Process Studio

E.

Through Object Studio

Which of the following Work Queue icons indicates a case currently being worked?

A)

B)

C)

D)

A.

Option A

B.

Option B

C.

Option C

D.

Option D