Summer Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: exc65

Kanban establishes a means of monitoring production, conveyance and delivery information such that efficient flow is established. The method used by Kanban is to require a _________ before anything moves.

A.

Sign-off

B.

Signal

C.

Bell to ring

D.

Work order

On a _________________ a Belt screens variables, or various inputs, to analyze their relative impact on the output of concern.

A.

X-Y Matrix

B.

Weighted Scale

C.

Multi-Vari Chart

D.

Poisson Chart

A(n) ______________ is best used to compare a Machine 1 average quality characteristic to the same quality characteristic of Machine 2.

A.

F test

B.

1-Sample t-test

C.

2-Sample t-test

D.

ANOVA test

Cost of Poor Quality (COPQ) can be classified as Visible Costs and Hidden Costs. Which of these items is a Visible Cost?

A.

Lost Customer Loyalty

B.

Time Value of Money

C.

Returns

D.

Late Delivery

Which statement is most correct for the Regression Analysis shown here?

A.

The Regression explains 50.8% of the process variation

B.

The air-fuel ratio explains most of the TurbineOutput variation

C.

This Simple Linear Regression explains 98+% of the process variation

D.

This Multiple Linear Regression has four statistically significant independent variables

An operator checks that all boxes being packed contain enough products to fill the box. However, each box getting filled has a different number of products in it. This is a Reproducibility problem, not a Repeatability problem.

A.

True

B.

False

Appropriate measures means that measurements are ______________.

A.

Representative

B.

Sufficient

C.

Contextual

D.

Relevant

E.

All of these answers are correct

The Lean toolbox includes all of these items except ________________.

A.

Mistake Proofing

B.

Visual Factory

C.

Design of Experiments

D.

Inventory Management

Time is always the metric on the horizontal scale of a(n) ___________ Chart.

A.

Pareto

B.

Xbar

C.

Multi-Vari

D.

NP

A Belt working in a supply chain environment has to make a decision to change suppliers of critical raw materials for a new product upgrade. The purchasing manager is depending on the Belt’s effort requiring that the average cost of an internal critical raw material component be less than or equal to $4,200 in order to stay within budget. Using a sample of 35 first article components, a Mean of the new product upgrade price of $4,060, and a Standard Deviation of $98 was estimated. The Alternative Hypothesis in the above example is?

A.

The Standard Deviation is equal to $300

B.

The Mean is less than $4,320

C.

The Mean is equal to $4,060

D.

The Mean is less than $4,200

E.

The Mean is greater than $ 4,200