Activity durations are normally estimated in an intuitive and subjective way. All of the following will improve duration accuracy EXCEPT
Management has determined the need to release the product 20 days earlier than planned. What tasks need to be expedited?

Which of the following are NOT normally included in the project scope statement, either directly or by reference?
Is activity 7001 pictured correctly in the precedence diagram?

Based on the stated costs, what percentage of the total cost comes from the 2000 series of activities?
What changes to logic would eliminate Activity B from the critical path?
You are providing construction management services for a small office building project. Your duties include reviewing and approving the contractor's baseline schedule. The contractor has submitted the first baseline schedule for the project.
The contractor has included codes for each activity that identify {1) the category of work and (2) the trade/subcontract performing the work. What can this code information be used for?
For which of these delays should an owner grant a time extension?
The EBS is established by:
Determine the correct formula and date for the late finish for Activity 6002.
 
				