By subtracting a measured unit productivity rate during an impacted period from the unit productivity rate during an unimpacted period, the resulting value represents:
What method offers the best chance of the schedule being used effectively to implement the project in the field?
The linear scheduling velocity diagram has the following two-axis:
Determine the correct formula and date for the late finish for Activity 6002.
Which of the following phases does NOT describe the commonly accepted construction life cycle?
Theoretically construct a summary activity for activities 2001 through 2004. Using the "normal" schedule, what is the cost of the hammock?
You are retained by a contractor who asks you to perform a simple as-planned versus as-built analysis (APAB) of a large hydro-electric dam project that took more than five years to complete. Your analysis will form the basis of a change order that requests a time extension. You suggest using a different methodology for quantifying the delay. Which of the following reasons for recommending a different analysis does NOT apply to a simple APAB analysis?
If no time extensions are granted and all actual delays are as described above, what will the total float calculation be at the end of the project?
Why does activity 1001 have two successor activities?
If someone wanted to constrain a project's end date so that any project slippage would cause negative float, they would do so by using