Activity 1001 started on the scheduled date but has slipped 10 days. Activity 10002 will slip 35 days. All remaining activities retain their original duration. What is the revised completion date?
What is the free float for Activity F?
As a change to the network for the current update, activity 6002 is required to begin ten days after the beginning of activity 6001. Which is the simplest logic organization?
What does the heavy, vertical line at "X" represent?
Which of the following is NOT true?
What was the original planned duration for Activity A through Activity G?
The activity with the most total float is:
Project delays are best analyzed
If all other work proceeds according to the Baseline plan, how many times will the critical path change?
During proofing of the product manual, a problem was discovered requiring 15 days additional time to effect a correction. How can the date of availability be maintained?