Summer Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: exc65

A company has the requirement to ensure that business-critical applications have the necessary network bandwidth to function optimally and maintain a consistent quality of service (QoS).

Which statement would be included in the conceptual design to support this requirement?

A.

A distributed switch will be created and Network I/O Control will be enabled.

B.

The network infrastructure must ensure secure communications and efficiently use available bandwidth.

C.

Network resource pool named "bca-pool-02" is given a reservation quota of 5 Gbit/sec.

D.

The distributed switch will use a minimum of 25 Gbps Ethernet.

An architect is designing a new vSphere 8 environment and needs to plan the migration of virtual machines from the source vSphere 7 infrastructure.

The following has been captured about the source infrastructure and project:

All virtual machines operate supported versions of Microsoft Windows

All virtual machines have VMware Tools 11 or higher installed

vCenter Enhanced Linked Mode is configured

VMware PowerCLI is available in the environment

No budget is available for discovery tooling

The architect must capture and review active services from inside running virtual machines to inform the migration design.

Considering the information available, which method can the architect use to acquire the information required?

A.

Request and review the information via VMware vCenter

B.

Deploy and review the service information from VMware Aria Operations

C.

Deploy and review the service information from VMware Aria Operations for Applications

D.

Request and review the information via VMware Tools and VMware PowerCLI

An architect is documenting the design for a new multi-site vSphere solution. The customer has informed the architect that the workloads hosted on the solution are managed by application teams, who must perform a number of steps to return the application to service following a failover of the workloads to the secondary site. These steps are defined as the Work Recovery Time (WRT). The customer has provided the architect with the following information about the workloads:

Critical workloads have a WRT of 12 hours

Production workloads have a WRT of 24 hours

Development workloads have a WRT of 24 hours

All workloads have an RPO of 4 hours

Critical workloads have an RTO of 1 hour

Production workloads have an RTO of 12 hours

Development workloads have an RTO of 24 hours

The customer has also confirmed that the Disaster Recovery solution will not begin the recovery of the development workloads until all critical and production workloads have been recovered at the secondary site.

What would the architect document as the maximum tolerable downtime (MTD) for each type of workload in the design?

A.

The different processor architectures across both sites will remediate against a shared vSphere Lifecycle Manager baseline.

B.

The different processor architectures will be located in the same cluster to support vSphere Lifecycle Manager image-based remediation.

C.

The different processor architecture within a single site will remediate against a single vSphere Lifecycle Manager image.

D.

The different processor architectures across both sites will remediate against a single vSphere Lifecycle Manager image.

An architect has made the following assumptions:

The customer will provide licensing for the vSphere platform.

The storage hardware has sufficient capacity for future workload scale.

The data center offers sufficient power, cooling and rack space for workload scale.

Which two risks must be documented in the design document in response to these assumptions? (Choose two.)

A.

The assumptions must be approved by the customer, architect and the architect’s company.

B.

The storage may not have capacity to accommodate 20% year over year virtual machine growth.

C.

The licenses provided by the customer only have support entitlement for one year.

D.

The customer may not have an existing licensing subscription that covers features the architect intends to use.

E.

The customer may not have sufficient data center cooling, power, and physical rack space available.

A company has a requirement that all production applications must have a maximum tolerable downtime (MTD) of one hour per month.

Which statement would be included in the physical design to support this requirement?

A.

vSphere HA will be enabled on all clusters.

B.

vSphere HA Host Failure Response will be set to Restart VMs.

C.

vSphere Fault Tolerance (FT) will not be enabled for the production applications.

D.

Server hardware has already been purchased for the production applications.

Which four factors should an architect consider when calculating the number of hosts required for a new multi-site vSphere-based solution that utilizes external storage? (Choose four.)

A.

The workload profile (CPU and memory) of each workload

B.

The amount of resources required for virtual machine (VM) swap and VM snapshots

C.

The number of existinq workloads that will be decommissioned prior to the completion of project

D.

The number of existinq workloads that will be miqrated onto the new solution

E.

The number of network connections per physical host server

F.

The future physical location of any workloads

G.

The hardware specification of the underlying infrastructure

An architect is documenting the design for a new vSphere cluster. The customer provides the following information:

All ESXi hosts will use hardware from the same vendor

All ESXi hosts will be monitored for hardware related issues using the vendor's monitoring tooling

The vendor's monitoring tooling provides a plugin for vCenter to allow the hardware status to be visible

The customer also informs the architect of the following requirements:

Workloads must be automatically relocated to other hosts in the event that a host hardware is marked as degraded.

Workloads must be automatically restarted on other hosts in the event of a host failure.

What should the architect include in the design to meet these requirements?

A.

vSphere HA will be enabled and set to Power off and Restart VMs in response to a host isolation.Proactive HA will be enabled with an Automation Level of Automated.

B.

vSphere HA will be enabled and set to Power off and Restart VMs in response to a host isolation.VM Monitoring will be enabled with a setting of VM Monitoring.

C.

vSphere HA will be enabled and set to restart VMs in response to a host failure.VM Monitoring will be enabled with a setting of VM and Application Monitoring.

D.

vSphere HA will be enabled and set to restart VMs in response to a host failure.Proactive HA will be enabled with an Automation Level of Automated.

An architect is designing a new vSphere solution. The solution will be used to host workloads that have multiple dependencies. The customer provides the following information regarding the workloads:

Workload 1: Self-Service Portal

Workload 2: Database

Workload 3: Identity Broker

Workload 4: Reporting Tool

Workload 5: Management Tool

Application A is formed of workloads 1 and 2 and has a dependency on workload 3

Application B is formed of workloads 2 and 4 and has a dependency on workload 3

Application C is formed of workload 5 and has a dependency on workload 4

How should the architect document the vSphere HA requirements to ensure that all of the applications can be recovered in the event of a host failure while observing the dependencies?

A.

Set vSphere HA to Restart VMs in response to a Host FailureSet the Restart Priority of workload 3 to HighSet the Restart Priority of workload 4 to MediumSet the Restart Priority of workloads 1, 2 and 5 to Low

B.

Set vSphere HA to Shut Down and Restart VMs in response to a Host IsolationSet the Restart Priority of workloads 3 and 4 to HighSet the Restart Priority of workload 5 to MediumSet the Restart Priority of workloads 1 and 2 to Low

C.

Set vSphere HA to Restart VMs in response to a Host FailureSet the Restart Priority of workloads 3 and 4 to HighSet the Restart Priority of workload 5 to MediumSet the Restart Priority of workloads 1 and 2 to Low

D.

Set vSphere HA to Shut Down and Restart VMs in response to a Host IsolationSet the Restart Priority of workload 3 to HighSet the Restart Priority of workloads 4 and 5 to MediumSet the Restart Priority of workloads 1 and 2 to Low

An architect is reviewing the information provided by a customer for a new vSphere solution design. The customer requests that the solution use multiple network connections for the ESXi management network to increase resilience.

A.

Availability

B.

Manageability

C.

Performance

D.

Recoverability

An architect has been tasked with designing a greenfield hosting platform.

As part of a workshop, it is identified that the new solution must support the following:

Provide a centralized way to enforce virtual network security policy

Provide network security for both virtual machines and containerized applications

Deny network access between all workloads by default

Linked services should be connected to the same virtual port groups by default

Support for the security teams network monitoring solution

Which elements should the architect include in the design to meet the identified requirements?

A.

VMware Standard Switches, Access Lists and Promiscuous mode

B.

Distributed Virtual Switches, Access Lists and Promiscuous mode

C.

VMware Carbon Black, Distributed Virtual Switches and Traffic Filtering

D.

VMware NSX, Distributed Firewalls and Port Mirroring