How is the distance between the project site and the manufacturing location determined for Materials and Resources Credit. Building Disclosure and Optimization - Sourcing of Raw Materials. Option 2. Leadership Extraction Practices?

A.

Roadway distance

B.

Straight line distance

C.

Rail freight distance

D.

Air freight distance

A real estate development company plans to build a mixed-use facility in an urban area. Which of the following strategies should the developer implement to support the local economy?

A.

Provide location-efficient affordable housing

B.

Provide workforce training

C.

Employ individuals from the local community

Which of the following documents contains the design team ' s interpretation of the Owner ' s Project Requirements?

A.

Basis of Design (BOD)

B.

Simple Box Energy Model Analysis

C.

System ' s manual

D.

Integrated Project Delivery report

A LEED Building Design and Construction project includes an outdoor stage for theatrical performances. In pursuit of Sustainable Sites Credit, Light Pollution Reduction the engineer has specified an LED fixture to illuminate actors on the stage while limiting light pollution. Which of the following suggestions should the LEED AP give to the project owner?

A.

Modify the design to enclose the performance areas

B.

Calculate the return on investment over the 20-year life of the project

C.

Compare the energy consumption against an alternative

D.

Inform the owner that the LED fixture is exempt from Sustainable Sites Credit, Light Pollution Reduction

Which of the following mandatory recyclable materials is required by MRp1: Planning for Zero Waste Operations for storage and collection?

A.

Textiles

B.

Ceramics

C.

Corrugated cardboard

What credit rewards customers who change their normal consumption patterns in response to the varying price of energy over time?

    Energy and Atmosphere Credit, Demand Response

    Energy and Atmosphere Credit, Advanced Energy Metering

    Energy and Atmosphere Credit, Building Level Energy Metering

A.

Energy and Atmosphere Credit, Green Power and Carbon Offsets

Which of the following are the major factors determining the total irrigation requirement for a particular landscaping design?

A.

Planting density, soil conditions, irrigation efficiency and rainfall

B.

Relative humidity, site exposure, plant species and planting density

C.

Plant species, rainfall, evapotranspiration rate, site exposure and irrigation efficiency

D.

Plant species, rainwater tank size, evapotranspiration rate, site exposure and irrigation efficiency

In order for a product to contribute to Materials and Resources Credit, Building Product Disclosure and Optimization, Environmental Product Declarations, Option 1. Environmental Product Declaration, the product needs to be

A.

Forest Stewardship Council (FSC)-certified

B.

cradle-to-cradle certified

C.

third-party verified in a Corporate Sustainability Report (CSR)

D.

critically reviewed life-cycle assessment conforming to ISO 14044

The goal of the design charrette during Integrative Process Prerequisite, Integrative Project Planning and Design is to:

A.

Develop the building energy model

B.

Optimize the green strategies across all aspects

C.

Calculate the life cycle cost of the building

D.

Choose an appropriate Commissioning Authority (CxA)

To achieve SSc6: Light Pollution Reduction using the Backlight, Uplight, and Glare (BUG) Rating Method, projects must demonstrate that all luminaires:

A.

Meet acceptable fixture ratings for the project’s Model Lighting Ordinance (MLO) lighting zone

B.

Have a minimum correlated color temperature of 3,500 K

C.

Are mounted at least three mounting heights from the lighting boundary

D.

Are full-cutoff fixtures