Three teams in the Agile Release Train are working on the same Feature. Team A is a complicated subsystem team, and Teams B and C are stream-aligned teams. During PI Planning, Teams B and C committed to delivering their part of the Feature by the end of Iteration five and plan to integrate with each other along with Team A's piece in the first week of the IP Iteration. Why is this an anti-pattern?
Which statement is true about batch size, lead time, and utilization?
Which two statements are true about a Feature? (Choose two.)
If the distance between the arrival and departure curves on a team's cumulative flow diagram is growing apart, what is likely happening?
The Agile Team includes the Scrum Master and which other key role?
When creating an Improvement Roadmap, what is one source of guidance for improving a team's technical practices?
If a team insists that big Stories cannot be split into smaller ones, how would the Scrum Master coach them to do otherwise?
How is average lead time measured in a Kanban system?
What is the primary measurement during Inspect and Adapt?
What are two benefits of applying cadence? (Choose two.)