Which checks can you run directly in an SAP ECC system to support the planning of a standard SAP S/4HANA conversion project? Note: There are 3 correct answers to this question.

A.

Custom Code Check

B.

Global Performance Analysis

C.

Authority Check

D.

SAP Readiness Check

E.

Simplification Item-Check

In a first step, you create an account with account type "secondary cost element" and cost element category "42" in controlling area A000 and company code 1010.In a second step, you change this account to cost element category "43" in company code 1750, which is assigned to the same controlling area. What is the effect in the system when you save this account?

A.

The system brings up an error message and rejectsthe change.

B.

The cost element category is different in the two company codes.

C.

The cost element category in the account is changed back to "42" for company code 1750.

D.

The cost element category in the account is changed for both company codes

You post a payment to a supplier invoice. In the universal journal table, you see that more line items are created than were visible in the document entry view. Which configuration may have caused the additional line items? Note: There are 2 correct answers to this question.

A.

A non-leading ledger

B.

The summarization in ACDOCA

C.

An extension ledger

D.

Zero balance indicator for profit center

What does the Parallel Accounting Using G/L Accounts indicator in ledger configuration allow you to do?

A.

Assign 2 or more ledgers to 1 accounting principle

B.

Assign 2 or more accounting principles to 1 valuation area

C.

Assign 2 or more accounting principles to the non-leading ledger

D.

Assign 2 or more accounting principles to the leading ledger