You want to reduce planning efforts for B/C materials. Which planning procedure do you recommend?
What type of time element can be reduced by strategy settings while dispatching?
What does it mean for the production planner when MRP works with infinite capacities?
In your project, you have several materials that are planned by different people. How can you assign the planning responsibility?
Mode selection is one of the scheduling options available in Advanced Planning in SAP S/4HANA. When can you use mode selection?
In the Schedule Production app which setting can you make for the planning strategy?
Which of the following are possible configuration steps when setting up the alert monitor in Advance Planning?
What could be the reason for multiple commitment of invidula capacities, where several operations have the same scheduled dates on a work center (or resource) after planing?
Your project used process orders for the production of liquid chemicals.
What can you define to ensure that the production flow happens only in physically connected tanks?
How can you achive a feasible production plan in case of capacity constraints?