Summer Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: exc65

For what type of cost collector does an inspection lot capture appraisal and non conformity costing?

A.

A company code general ledger

B.

A quality Notification

C.

A quality management order

D.

A controlling general ledger

Which process step can automatically create a quality notification?

A.

Creation of quality info record

B.

Characteristics result recording

C.

Making a UD

D.

Creation of an inspection Lot

When creating a process order , what type of task list is primary used for inspection ? Correct 3

A.

Reference rate routing

B.

Routings

C.

Master recipe

D.

Equipment

Which object type is not stored directly in the data set of a supplier claim notification?

A.

Purchasing document

B.

Material document

C.

Purchasing organization

D.

Quotation

What is required in inspection planning to transfer a characteristic value from results recording of inspection lot processing

A.

Settings for the inspection type activated in the material level

B.

Usage of the class characteristics in the task list

C.

Configuration settings

D.

Master inspection characteristic linked to class characteristics

Which of the following physical sample categories can you create from a primary sample (2 correct ans )

A.

Mixed sample

B.

Pool sample

C.

Drew sample

D.

Dip sample

E.

Reserve sample

What do the selection and evaluation of audit monitoring display? Note : 2 correct answer

A.

The QM-STI(Quality Management- Statistic Interface)report

B.

Audit component according to different criteria

C.

Tabular Overview lists of audit components

D.

Detailed audit valuation

Your customer wants material -dependent code selected from a catalog to show when a Where can you control and limit the codes?

A.

Catalog profile

B.

Catalog settings

C.

Catalog groups

D.

Product hierarchy

Your costumer wants to determine a critical defect class Which of the following function are possible during results recoding? Correct 2 ans

A.

Active a quality notification

B.

Trigger a workflow

C.

Trigger a subsequent inspection lot

D.

Tighten the quality level

For which of the following QM elements can the short text be maintained in only one language.

A.

MIC

B.

Inspection Method

C.

Inspection Plan header

D.

Code group and code