Summer Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: exc65

Which steps are available for the maintenance technician when using the Report Malfunction bile? Note: There are 3 correct answers to this question.

A.

Select and print the maintenance order shop papers

B.

Display the current location of the technical object

C.

Add a URL to provide further information

D.

View details of the technical object by navigating to the Asset Viewer

E.

Input estimated costs for repair malfunction

What do you have to consider when setting up the refurbishment process?

A.

Assign valuation type C to the order type.

B.

Assign a view profile for refurbishment to the order type.

C.

Assign a stock determination rule to the PM order type

D.

Mark the order type for refurbishment in customizing.

You want to set up a scenario for regular maintenance. The first event should take place after 1 year, after that, it is a regular cycle of 6 months. Which parameter do you have to use to map this in the system?

A.

Package hierarchy

B.

Scheduling indicator

C.

Maintenance package offset

D.

Cycle modification factor

The planner adds non-stock material in a released maintenance order. What are possible options within the maintenance order? Note: There are 3 correct answers to this question?

A.

A purchase requisition can be created automatically as soon as the order is saved.

B.

The maintenance order can be set to TECO before the invoice is created

C.

A goods receipt can be posted after the maintenance order is technically completed.

D.

A purchase order is created automatically as soon as the order is saved.

E.

A purchase requisition will ALWAYS be created as soon as the order is saved.

How is Phase-based Maintenance Processing activated in the SAP system? Note: There are 2 correct answers to this question

A.

Through Best Practices scope items 4HH and 4HI.

B.

Phase-based maintenance is always active in all S/4HANA 2021 editions and above

C.

By installing the corresponding enhancement pack and activating the related business function

D.

By manually activating the corresponding Business Feature in case Best Practices are not used.

You want to have several plan dates calculated in a maintenance plan.Which scheduling parameter do you use?

A.

Scheduling indicator

B.

Scheduling period

C.

End Date for Scheduling

D.

Call horizon

What is the goal of embedded analytics in SAP S/4HANA?

A.

To integrate BW Data Store Objects

B.

To combine transactional and analytical processing

C.

To allow both tactical and strategic analyses within the S/4HANA core

D.

To integrate BW Info Cubes

Which scheduling parameters are used in a multiple-counter plan? Note: There are 2 correct answers to this question.

A.

Scheduling period

B.

Start date

C.

Scheduling indicator

D.

Factory calendar

Which functions characterize a Strategic analysis as opposed to embedded analysis within the SAP S/4HANA core system? Note: There are 2 correct answers to this question

A.

Preconfigured Core Data Service (CDS) containing SQL views

B.

A collection of tools that are not included with core SAP S/4HANA

C.

SAP Business Objects as a part of SAP Business Warehouse (BW)

D.

SAP Business Objects Business Intelligence for Visualization

Which views can you assign to an equipment category via a view profile? Note: There are 2 correct answers to this question?

A.

Warranty

B.

Configuration

C.

Serial data

D.

Manufacturer data