What are the relevant use cases for helper key figures?Note: There are 2 correct answers to this questions.

A.

Used at any level of calculation level except the Request Level

B.

Used when you have more than three inputs at different planning levels in one calculation

C.

Used by end-users in planning views to help visualize cross-period calculations

D.

Used to break down a large calculation into manageable subcalculations

You are starting a new implementation project for SAP IBP and are considering the possible system architecture.What are the possible approaches for setting up the system landscape?Note: There are 2 correct answers to this question.

A.

Create additional planning areas in the test system to support training needs.

B.

Set up a three-tier landscape using transport, starting from the development system to test and production.

C.

Set up a two-tier landscape, and have the configuration of the development system regularly updated from the production system.

D.

Create additional test planning areas in the production system to support cutover needs.

Which constraints are taken into account by the Time-Series-Based Supply Planning Heuristic (Infinite)?Note: There are 3 correct answers to this question.

A.

Transportation lead times

B.

Maximum lot size

C.

Minimum lot size

D.

Adjusted transport receipts

E.

Aggregated constraints

A time profile is defined with these levels: day, technical week, week, month, quarter, and year. What condition in configuration will allow you to have a different value in the current week, versus all other time buckets?

A.

IF("PERIODID4" ="$$PERIODID4CU$$...)

B.

IF("PERIODID2" ="$$PERIODID2CU$$...)

C.

IF("PERIODID3" ="$$PERIODID3CU$$...)

D.

IF("PERIODID5" ="$$PERIODID5CU$$...)

Which of the following key functions are supported by SAP IBP for sales and operations?Note: There are 2 correct answers to this question.

A.

Time series analysis

B.

Simple statistical forecast

C.

Scenario analysis for operational supply planning

D.

Multi-Level Supply Planning Heuristics