When executing a FlashArray upgrade from the FA-405 to a FA-X Series, into which slot on CT1 must the 2 Port InfiniBand Card be installed?

A.

0

B.

2

C.

3

Prior to installing a new FlashArray controller, which terminal display settings must the Implementation Engineer configure?

A.

8-E-1, Xon/Xoff flow control, 115,200 baud

B.

8-N-1, No flow control, 115,200 baud

C.

8-N-1, Xon/Xoff flow control, 38,400 baud

D.

7-E-1, Hardware flow control, 9,600 baud

An Implementation Engineer is onsite to add two 4-port FC cards to a FlashArray//X20R3. In what state should the controller be in before performing the card add procedure?

A.

Primary

B.

Secondary

C.

Standby

What are the default replication ports on all three rack unit FlashArray models?

A.

ETH2 and ETH3

B.

ETH4 and ETH5

C.

ETH0 and ETH1

A customer has a DirectFlash Shelf installed on a FlashArray//X90R4. The 208V rack PDUs are full, but there are five 120V connections available at the top of the rack. What should the Implementation Engineer understand about powering the DirectFlash Shelf in this scenario?

A.

The Shelf requires at least 180V to operate and Will NOT power on With 120V.

B.

The shelf can be fully supported by 120V for the duration of its service life.

C.

The shelf can operate temporarily on 120V, but 208/240V should be used as soon as it's available.

What is the redundancy of the FlashArray//XL PSUs?

A.

1+1

B.

2+2

C.

3+1

An Implementation Engineer is installing the first DirectFlash Shelf (DFS) on a FlashArray//XR4 controller. Which ports should the Implementation Engineer use for the connection?

A.

ETH 10/11

B.

ETH 0/1

C.

ETH 18/19

On a FlashArray running Purity 6.9.2+, what is the recommended way to initiate a planned controller failover during a FlashArray//XR5 HWNDU?

A.

purewes controller setattr --verify-array < host-name > ct0 --mode secondary

B.

puredb giveback --safe

C.

purendu procedure start giveback

D.

purehw controller failover

On FlashArray//XL, which slots support a 4-port FC card?

A.

5 and 8

B.

3 and 8

C.

2 and 8

An Implementation Engineer is getting ready to install four DFMs into a 16-module efficiency bundle and notices that the new modules are DFMDs while the installed modules are DFMs. What should the Implementation Engineer do to get the array using a 20-module Wide write group?

A.

Install the four new DFMDs and run puredrive .

B.

Work With the account team to Ship DFMS instead Of the DFMDS.

C.

Install the four new DFMDs, run puredrive admit and have support set the tunable puretune --set ALLOW_DFMD_IN_DFM_WWG 1