When executing a FlashArray upgrade from the FA-405 to a FA-X Series, into which slot on CT1 must the 2 Port InfiniBand Card be installed?
Prior to installing a new FlashArray controller, which terminal display settings must the Implementation Engineer configure?
An Implementation Engineer is onsite to add two 4-port FC cards to a FlashArray//X20R3. In what state should the controller be in before performing the card add procedure?
What are the default replication ports on all three rack unit FlashArray models?
A customer has a DirectFlash Shelf installed on a FlashArray//X90R4. The 208V rack PDUs are full, but there are five 120V connections available at the top of the rack. What should the Implementation Engineer understand about powering the DirectFlash Shelf in this scenario?
What is the redundancy of the FlashArray//XL PSUs?
An Implementation Engineer is installing the first DirectFlash Shelf (DFS) on a FlashArray//XR4 controller. Which ports should the Implementation Engineer use for the connection?
On a FlashArray running Purity 6.9.2+, what is the recommended way to initiate a planned controller failover during a FlashArray//XR5 HWNDU?
On FlashArray//XL, which slots support a 4-port FC card?
An Implementation Engineer is getting ready to install four DFMs into a 16-module efficiency bundle and notices that the new modules are DFMDs while the installed modules are DFMs. What should the Implementation Engineer do to get the array using a 20-module Wide write group?