Your client has installed scalar devices to measure the solar energy generated (Export) and the energy received (Import) from the National Grid. This data is stored in separate measuring components (registers).
The validation rules are generally the same for both measuring components, but there is one exception. The Negative Consumption check applies only toenergy received (import).
Which two are possible configurations resulting in the Negative Consumption rule being checked for energy received (import) only? (Choose two.)
How do you ensure that specificValidation, Editing, and Estimation (VEE) rules are applied to estimated measurements?
If a customer makes a payment for more than what is due for the account, which entity contains the logic for how this overpayment should be handled?
Which usage rule would be used to retrieve scalar measurements and convert the total from one unitof measure to another?
Which major entities hold the key geographic, demographic, and financial information related to a customer who is financially responsible for a property?
New: An electric utility is starting an Advanced Meter Infrastructure (AMI) roll-out for their residential customers. The initial plan is to roll out devices from their manufacturer with potentially three different device models. The customer has not decided what head-end systems they will use to communicate with these devices. Based on the customer’s initial roll-out strategy, the devices will haveto be configured consistently to support existing tariffs for billing.
Which is a valid consideration to determine the setup of device type administrative data for this implementation?
Your implementation requires an installation of two types of devices:
Electric Smart Meter
Gas Manual Meter
Which two Device Type attributes are required to identify these device types? (Choose two.)
What correctly describesthe possible causes of price proration?
How many devices can be installed at a service point at an instance in time?
Which relationship must be established with an external system or a service provider before creating bill determinants?