Which two statements are correct about adding an additional database server to a physical Exadata X9M Database Machine using Oracle Exadata Deployment Assistant (OEDA)?
How do ASM failure groups provide redundancy?
Which statement is true about the Persistent Memory Commit Accelerator?
What are two recommended configuration best practices for backup and recovery on Exadata?
Which two quarantine types can disable Smart Scan for multiple databases that offload SQL statements to a cell on an Exadata Database Machine?
You have been tasked with replacing a memory module of an Exadata Storage Server and need to power off the affected storage server. Which two commands must you execute to safely power off the storage server in an Exadata X9M Database Machine?
You are hardening the security posture of your Exadata Database Machine. Before disabling ssh access to the storage servers, what should you do to enable REST access to the MS process?
You have been asked by Oracle Support to check the firmware of the hard & flash disks in a storage server. Which cellcli command should you use to get this information?
You are planning the monitoring configuration for your Exadata X9M Database Machine.
Which three components are monitored directly through the use of Exadata-specific Enterprise Manager Plug-Ins?
You have been asked to design a backup solution for an Exadata X9M-2 Quarter Rack with Extreme Flash Storage Servers connected to a new ZFS Storage Appliance ZS7 with 2 Storage Controllers with 100Gb Ethernet cards and 3 Storage Trays. You are using Oracle Exadata Configuration Assistant to validate the rack layout.
1. Use "Add Equipment" to add the Exadata X9M EF Storage Servers, starting from RU10.
2. Use drop down to add ZFS Storage Appliance Controllers.
3. You cannot add ZFS Storage Appliance to an Exadata Rack.
4. Use "Add Equipment" to add the ZFS Storage Trays, starting from RU1.
5. Use drop down to add ZFS Storage Trays.
6. Use "Add Equipment" to add the Exadata X9M Database Servers, starting from RU16.
7. Use "Add Equipment" to add the Exadata X9M EF Storage Servers, starting from RU1.
8. Use drop down to add Exadata X9M EF Storage Servers.
9. Use "Add Equipment" to add the ZFS Storage Controllers, starting from RU27.
10. Use drop down to add Exadata X9M Database Servers.
11. Use "Add Equipment" to add the ZFS Storage Trays, starting from RU31.
Which of these steps are correct and what is their correct order?