An employee is responsible for dealing with different manufacturing practices and processes, machines, tools, and equipment that turn raw material into a product.

Which seeded job role must you assign to this employee?

A.

Manufacturing Engineer

B.

Production Engineer

C.

Manufacturing Supervisor

D.

Production Operator

E.

Production Supervisor

A Production Operator needs to load work order operation transactions from an external system into Manufacturing Cloud.

What is the correct sequence of tasks to achieve this?

A.

Export file to UCM server > Load data to data repository > Process import operations transactions > Load file from UCM to interface table.

B.

Load data to data repository > Load file from UCM to interface table > Export file to UCM server > Process import operations transactions.

C.

Load data to data repository > Export file to UCM server > Process import operations transactions > Load file from UCM to Interface table.

D.

Load data to data repository > Export file to UCM server > Load file from UCM to interface table > Process import operations transactions.

You create a work order, in which some of the operations have components with the Push supply type. While reporting material consumption on the Report Material Transaction page, you want the Push components to default whenever the operator selects Show Components.

Which setup task must you perform in the Manage Plant Parameters section to achieve this?

A.

Set Default Transaction Mode to Entered and Default Transaction Quantity to Work Definition.

B.

Set Default Transaction Mode to Work Definition.

C.

Set Default Transaction Mode to AIL

D.

Set Default Transaction Mode to Entered.

You are implementing project-driven supply chain functionality. You need to set up movement requests to issue or transfer project material to manage the inventory associated with projects and tasks.

Which two are types of movement requests to issue or transfer project material?

A.

Transfer project material from one subinventory to another.

B.

Pick transactions Interfaced by the project costing project and task using the project material, common Inventory, or Inventory from another project.

C.

Create o movement receipt line with the Project Costing widget.

D.

Perform manual pick for such movement requests using the project material, common inventory, or inventory from another project.

Which statement is NOT true about the Reservations tab?

A.

Demand details displayed are: Document Type (such as Sales Order), Customer Number and Name, Document Number, Due Date, and Quantity.

B.

Reservations are generally created when a Back-to-Back sales order or a Configured Items sales order Is reserved for the work order.

C.

A work order can be reserved against one or more sales orders.

D.

Manual reservations can be done for a work order in inventory.

E.

You can view the reservation details of a work order as a source of demand, and a sales order as supply.

A Manufacturing Engineer in a plant is creating an alternate manufacturing process for an item using its existing work definitions. After copying from the existing work definition, WD1, to the alternate work definition, WD2, the engineer finds that the operation items were not copied in the alternate manufacturing process WD2.

What is the reason for this?

A.

Production Priority was not populated in the new WD2 during creation.

B.

Item and Structure Name in the existing WD1 were retained in the new WD2 during creation.

C.

Item and Structure Name were changed in the new WD2 during creation.

D.

Start Date was not populated in the new WD2 during creation.

Which statement is NOT true about user-defined work order statuses?

A.

The system automatically updates user-defined work order statuses.

B.

They are displayed on work order reports.

C.

It is not recommended to update the name of the system status.

D.

All the new statuses are searchable so you can filter your job and manage the work order life cycle more easily.

Which three types of item quantities are displayed on the Work Order History tab?

A.

In Process

B.

Scrapped

C.

Completed

D.

Remaining

E.

Total

Which three statements are true about executing rework work orders with manual control?

A.

You can perform operation completion only after the assembly has been issued to the work order, and only up to the quantity that the assembly component item Is issued to the work order.

B.

You can cancel the work order after releasing it and after performing any transactions.

C.

You must manually issue the assembly item to rework a work order, either partial or full quantity.

D.

You cannot cancel the work order after releasing it or after performing any transactions.

E.

If the group has grouping attributes, only work orders that match the grouping attribute values can be assigned to the groups.

Your client's company is in a regulated industries and must keep detailed records of their product manufacturing processes in accordance with the United States Food and Drug Administration (FDA) regulation on electronic records and signatures called 21 Code of Federal Regulations (CFR) Part 11.

You are implementing Oracle E-Signatures and E-Records for securely capturing, storing, retrieving, and printing electronic records and signatures in manufacturing. They enable Deferred Electronic Records and Electronic Signatures for Manufacturing Work Order Release in Oracle Manufacturing Cloud.

Which statement is NOT true about using Deferred Electronic Records and Electronic Signatures for Manufacturing Work Order Release?

A.

It generates e-records on initial work order release through UI and sends notifications to approvers.

B.

Using a deferred approval process with notifications, the work order is held in "Released" status until the approvals are obtained.

C.

If the e-record is rejected, you can optionally resubmit the rejected electronic records.

D.

These capabilities are supported for discrete and process work orders.